{"id":5979,"date":"2024-06-19T22:36:56","date_gmt":"2024-06-19T20:36:56","guid":{"rendered":"https:\/\/ingenius.ecoledesponts.fr\/?p=5979"},"modified":"2025-07-29T16:19:36","modified_gmt":"2025-07-29T14:19:36","slug":"extension-of-light-metro-tram-line-2-line-towards-ennasr-tunisia","status":"publish","type":"post","link":"https:\/\/ingenius.ecoledesponts.fr\/en\/articles\/extension-of-light-metro-tram-line-2-line-towards-ennasr-tunisia\/","title":{"rendered":"Extension of light metro tram Line 2 line towards Ennasr (Tunisia)"},"content":{"rendered":"\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"767\" height=\"1024\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-767x1024.jpg\" alt=\"\" class=\"wp-image-5536\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-767x1024.jpg 767w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-225x300.jpg 225w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-768x1025.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-1920x2563.jpg 1920w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-scaled.jpg 1917w\" sizes=\"auto, (max-width: 767px) 100vw, 767px\" \/><figcaption class=\"wp-element-caption\">Avenue Habib Bourguiba Tunis \u00a9 Bilal Ayadi, 2022<\/figcaption><\/figure>\n\n\n\n<p class=\"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size wp-elements-adf36efff99ae6bae78dc42f8aa86b41\">This project is part of the<strong> Specialized Master\u00ae in Rail and Urban Transport Systems <\/strong>at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.<br><br>The students&#8217; work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.<br><br>An English summary of the work is published each year in the yearbook on the MS website.- Federico Antoniazzi<br><br><strong>Work by : Imen Ben Hamida Slim, Ad\u00e8le Darde, Marine Ferrero, Guillaume Morbin, Fran\u00e7ois Phelippeau<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Diagnostic and challenges of the project<\/h2>\n\n\n\n<p>The Ennasr district of the Greater Tunis region is a residential area connected to the region&#8217;s economic activities. Ennasr I and II mainly comprise local shops and services, but with very few public green spaces and cultural activities.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"680\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-1024x680.jpg\" alt=\"\" class=\"wp-image-5539\" style=\"width:745px;height:495px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-1024x680.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-300x199.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-768x510.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-1920x1275.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Avenue H\u00e9di Nouira, heart of Ennasr<\/em> \u00a9 Citizen59, 2010, CC BY-SA 3.0 (source: Wikimedia Commons).<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Residents suffer from a shortage of public transport. The system in Tunisia is characterized by excessive centralization but a lack of coordination between actors. Transport policies often give priority to road projects over urban transport.<\/p>\n\n\n\n<p>Collaboration between the Ministry of Transport and the Ministry of Equipment, Housing and Land Use Planning is unbalanced, resulting in a shortfall in urban transport investment.<\/p>\n\n\n\n<p>Greater Tunis has various modes of transport, including a light rail system operated by public company Transtu. However, lack of maintenance reduces train availability and thus the capacity of the network. A major transport project is under construction in the region, the <em>R\u00e9seau Ferroviaire Rapide<\/em> (RFR, Rapid Rail Network), with the aim of connecting the suburbs to the center of Tunis.<\/p>\n\n\n\n<p>The initiative to extend Line 2 of the Tunis light rail system aims to improve the situation, but faces internal and external challenges.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Route selection<\/h2>\n\n\n\n<p>4 scenarios have been developed:<\/p>\n\n\n\n<ol style=\"list-style-type:1\" class=\"wp-block-list\">\n<li>Extension of the existing line to connect the districts of Ennasr I and II to the center of Tunis<\/li>\n\n\n\n<li>Creation of a branch on Line 2, with La Jeunesse as a common station, to serve the districts of Ennasr<\/li>\n\n\n\n<li>Extension of Line 5 along the X20 expressway<\/li>\n\n\n\n<li>Creation of a BRT line linking Place de la R\u00e9publique to the Ennasr districts.<\/li>\n<\/ol>\n\n\n\n<p>A multicriteria analysis was conducted to evaluate the scenarios. Scenarios 3 and 4 were rejected due to their uncompetitive travel times and the additional investments required.<\/p>\n\n\n\n<p>The analysis identified several arguments in favor of Scenario 2. It provides better service to residential and employment areas, has a sustainable business model with reduced operating costs, and allows for a concentration of traffic in the center of Tunis. Although it has a larger environmental footprint, it carries more passengers with fewer trains.<\/p>\n\n\n\n<p>The final route involves the creation of a branch on light metro Line 2 along Avenue H\u00e9di Nouira, with a terminus located in the first third of the avenue due to the steep slope.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"724\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-1024x724.png\" alt=\"\" class=\"wp-image-5541\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-1024x724.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-300x212.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-768x543.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-1920x1358.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Route path selected to serve Ennasr \u00a9 Ad\u00e8le Darde, 2023 (map data: OpenStreetMap contributors).<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Passenger flow forecast<\/h2>\n\n\n\n<p>Once the final route has been selected, passenger flows can be estimated. The analysis consists in defining a catchment area of 500 meters around each station. The number of people inside each catchment area is then inferred from the demographic data, corrected by a forecast factor (target 2044). This yields a number of 84,000 persons. Under the assumption that only part of the active population takes public transportation, the predicted passenger flow is 25,600 passengers per day and per direction.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-1024x577.png\" alt=\"\" class=\"wp-image-5543\" style=\"width:582px;height:328px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-1024x577.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-300x169.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-768x433.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-1920x1082.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"> Catchment area around each station of the extension \u00a9 Guillaume Morbin, 2023 (data: Institut National de la Statistique de Tunisie; map data: QGIS).<\/figcaption><\/figure>\n\n\n\n<p>The breakdown of passengers over the day is projected based on a typical curve, with peak periods of 2 hours in the morning and 3 hours in the evening, and flatter traffic in between. This results in traffic of 5,300 PPHPD.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3-1024x576.jpg\" alt=\"\" class=\"wp-image-5547\" style=\"width:554px;height:312px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3-1024x576.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3-300x169.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3-768x432.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Breakdown of passenger flows over the day \u00a9 Guillaume Morbin, 2023<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Description of the route <\/h2>\n\n\n\n<p><strong>Route geometry<\/strong><\/p>\n\n\n\n<p>The constraints that guided the route design are mainly road intersections. 8 roads intercepting the project have been identified, as well as the X2 expressway that runs alongside it.<\/p>\n\n\n\n<p>In addition, a major creek runs laterally along the corridor, necessitating the provision of adequate drainage systems.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"751\" height=\"856\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure5.png\" alt=\"\" class=\"wp-image-5549\" style=\"width:456px;height:520px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure5.png 751w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure5-263x300.png 263w\" sizes=\"auto, (max-width: 751px) 100vw, 751px\" \/><figcaption class=\"wp-element-caption\">Route integration along Route X2 with crossing solutions \u00a9 Imen Ben Hamida Slim, 2023 (map data: OpenStreetMap contributors).<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Although the terrain is mostly relatively flat, the northern section has steep gradients exceeding the traction capacity of the tram.<\/p>\n\n\n\n<p>The route presents three narrow radii at the junction with Route X. To reduce the crossing of Route X2, a curve and counter-curve with a 30m radius were included. For the bend between Road X2 and Avenue H\u00e9di Nouira, the roundabout is crossed in the middle to optimize visibility and avoid expropriations in a very dense urban environment.<\/p>\n\n\n\n<p><strong>Route characteristics<\/strong><\/p>\n\n\n\n<p>The route is a 5.6 km extension of light metro Line 2.<\/p>\n\n\n\n<p>The fork is created after La Jeunesse station by inserting turnouts onto the existing tracks. The tracks then follow Route X2 along its east side as far as Menzah IV station. They then cross Route X (Avenue 14 Janvier 2011) and part of Route X2 (Avenue 1 Septembre 1969) over a viaduct leading to the central reservation of Route X2. The route then continues along the axis of Route X2 to Ennasr station. The overpass crosses Route X20, bends to run parallel to the Route X20 bypass on Avenue H\u00e9di Nouira, and stops some 500m east of the X2-X20 intersection.<\/p>\n\n\n\n<p>The planned terminus is located on the north side of Route X20, enabling the line to be extended towards the center of Ennasr along Avenue H\u00e9di Nouira.<\/p>\n\n\n\n<p><strong>Bridges<\/strong><\/p>\n\n\n\n<p>5 concrete bridges are planned at the most important intersections with the highest traffic volumes, to maintain commercial speed and avoid generating road traffic congestion.<\/p>\n\n\n\n<p>These include 2 major viaducts with respective lengths of 350m and 120m, and 3 slab bridges. There are also 3 level crossings. The type of structure for the viaducts is a U-shaped precast, prestressed concrete deck. This type of structure has many advantages, including its aesthetic appeal, speed of execution, possibility of cross-sections greater than 25m, low cost and safety features.<\/p>\n\n\n\n<p><strong>Stations<\/strong><\/p>\n\n\n\n<p>Station location choices are based on proximity to neighborhoods, location of intersections and bridges, normative recommendations, and existing characteristics. They are also designed to enhance intermodality for pedestrians and cyclists, and link the districts separated by Route X2.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"609\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6-1024x609.png\" alt=\"\" class=\"wp-image-5551\" style=\"width:586px;height:349px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6-1024x609.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6-300x178.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6-768x456.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6.png 1893w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Integration of stations and pedestrian pathways across Route X2 \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023 (map data: Google Earth).<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Infrastructure and trackside equipment<\/h2>\n\n\n\n<p><strong>A track compatible with existing trams and with optimized costs<\/strong><\/p>\n\n\n\n<p>The extension will be connected to the existing Line 2. To ensure interoperability with the existing system, the tracks will have a standard gauge of 1,435. Track installation will be integrated into the roadway in road intersection areas. Elsewhere, track installation will involve laying ballast track to ensure lower project costs.<\/p>\n\n\n\n<p><strong>Modern systems to optimize availability and productivity<\/strong><\/p>\n\n\n\n<p>Modernization of the control-command and maintenance centers will contribute to the efficiency and productivity of Line 2. The trains and track will be equipped with locating equipment, communication devices and crossroad priority systems. Device communication will allow system monitoring to maintain increased overall availability. Train locations will be fed to the operation control center to manage train operations and passenger information systems. Crossroad priority systems will be studied in conjunction with road light signals with the aim of improving commercial speeds.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Attractive, efficient rolling stock<\/h2>\n\n\n\n<p>34 new trams will connect the Ennasr district to Tunis city center. Their final design will be chosen by the local population to involve them in the project. Capacity, comfort, and performance are expected to ensure the attractiveness, efficiency and productivity of the system. When operated in double units, the trains can accommodate 600 passengers. They will be interoperable with the existing light metro system and therefore contribute to its the renovation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">A modernized customer relationship<\/h2>\n\n\n\n<p>The project relies on recent technologies to manage sales, passenger information and security through video surveillance. Several sales systems are planned to allow access for all to the transport system. There will be station sales terminals, rechargeable cards, or the Transtu app via mobile phones. The trainsets are equipped with validation terminals which are compatible with all the systems mentioned above. Equipment such as static line plans, screens and speakers, integrated in stations and in trains, will keep passengers informed throughout their journey. Information will also be available by digital means through the Transtu application or social networks. Finally, CCTV cameras fitted to the stations and trainsets will assist security teams in deterring anti-social behavior or responding faster to incidents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Operation<\/h2>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"334\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7-1024x334.png\" alt=\"\" class=\"wp-image-5553\" style=\"width:628px;height:205px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7-1024x334.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7-300x98.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7-768x250.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7.png 1083w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Schematic diagram of Line 2 with its extension \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n\n\n\n<p>Operational conditions are designed to match transport demand. Headway during peak hours is determined based on the capacity of a train of 606 passengers and the target PPHPD. That leads to a headway of 3 minutes on the central section and of 6 minutes on each branch. Journey times are simulated based on the characteristics of the rolling stock and the interstation distances; journey time from end to end is around 30 minutes, which is faster than by car (50 minutes).<\/p>\n\n\n\n<p>The presence of a fork on the extended line induces operational complexities. To address them, a global analysis simulating peak-hour traffic was performed. The simulation identified the critical sections and bottleneck on the itinerary. In particular: the central section where the headway is minimal (3 minutes), the fork at La Jeunesse station where trains from Ennasr and Ariana converge, turnback management at the Place de la R\u00e9publique terminus where the flow is the highest, and finally turnback management at the Ennasr terminus with limited siding positions. In conclusion, the timetable is robust and stable, and can be replicated during the day.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"925\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8-1024x925.png\" alt=\"\" class=\"wp-image-5555\" style=\"width:452px;height:408px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8-1024x925.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8-300x271.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8-768x694.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8.png 1511w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Critical sections on the train diagram during peak hour \u00a9 Marine Ferrero, 2023 (source: OpenTrack).<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Maintenance<\/h2>\n\n\n\n<p>Maintenance of rolling stock and infrastructures will be handled by the existing maintenance and storage facility in Ariana. As part of the extension project, this site must be upgraded and modernized to improve working conditions and enhance all maintenance activities. Ideally located with its connection to the current terminus of Line 2, the site also has empty land in the South, where a training center will be built.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"717\" height=\"1024\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9-717x1024.png\" alt=\"\" class=\"wp-image-5557\" style=\"width:499px;height:713px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9-717x1024.png 717w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9-210x300.png 210w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9-768x1097.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9.png 771w\" sizes=\"auto, (max-width: 717px) 100vw, 717px\" \/><figcaption class=\"wp-element-caption\">Maintenance and storage facility in Ariana \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conditions required to implement this project<\/h2>\n\n\n\n<p>To ensure the project\u2019s successful integration and functionality within the Greater Tunis light metro network, it requires the establishment of<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A single local transport authority: an RAOLT (Regional Authority Organizing Land Transport) would oversee and coordinate public transport services, including contributions from various local entities and private employers,<\/li>\n\n\n\n<li>Operations and maintenance skills.<\/li>\n<\/ul>\n\n\n\n<p>Regarding the existing legal and institutional frameworks, we recommend the DBFM Design Build Finance and Maintenance model (PPP structure), leaving operations to the existing operator and including the financing, construction and maintenance of the system. This model requires a concession contract with the existing operator to guarantee service quality and regulation standards.<\/p>\n\n\n\n<p>By implementing these recommendations, the project will improve the reliability of the light rail system, ultimately enhancing the overall public transportation network.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"593\" data-id=\"5563\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-1024x593.jpg\" alt=\"\" class=\"wp-image-5563\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-1024x593.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-300x174.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-768x445.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1.jpg 1358w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Selection of the contractual model \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"496\" data-id=\"5562\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-1024x496.jpg\" alt=\"\" class=\"wp-image-5562\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-1024x496.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-300x145.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-768x372.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11.jpg 1404w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Contractual structure of the Ennasr project <em>\u00a9 Ad\u00e8le Darde, 2023.<\/em><\/figcaption><\/figure>\n<\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Economic and financial feasibility<\/h2>\n\n\n\n<p>During the 30-year contract with the Project Company, annual ridership will stabilize at 29.7M around year four. This project will require an initial investment of \u20ac176.95M.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"634\" height=\"336\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure12.png\" alt=\"\" class=\"wp-image-5565\" style=\"width:446px;height:236px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure12.png 634w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure12-300x159.png 300w\" sizes=\"auto, (max-width: 634px) 100vw, 634px\" \/><figcaption class=\"wp-element-caption\">Estimated initial investment of the light metro extension project \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n\n\n\n<p>To incentivize use of this mode of transportation, three types of tickets are proposed (single ride, monthly, annual and school subscriptions) with a 50% reduction for school and social fares. Additionally, the stations offer opportunities for advertising revenue and commercial space utilization.<\/p>\n\n\n\n<p>Total annual operating revenue amounts to \u20ac3.147M. The cost structure comprises personnel expenses, as well as costs associated with maintenance of the trains and infrastructure. Importantly, the evaluation incorporates the cost difference to reflect Tunisian conditions accurately. The annual costs are estimated at \u20ac10.1M for an annual distance travelled of 1,744,797km.<\/p>\n\n\n\n<p>Considering depreciation of the initial investment (\u20ac9.03M), revenues cover 31% of the operating and maintenance costs. The balancing subsidy encompasses government compensations, financial charges, and taxes, amounting to \u20ac16.585M per year (based on the fourth year).<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Planning and timeline<\/h2>\n\n\n\n<p>The creation of an institutional and regulatory coordination body for urban transport in Tunis is a crucial first step to ensure the smooth operation of the network. It will be responsible for coordinating transport intermodality in Greater Tunis and for steering the network\u2019s economic and financial performance.<\/p>\n\n\n\n<p>Preliminary work and earthworks will be carried out to prepare the space required for the infrastructure, which may include archaeological excavations.<\/p>\n\n\n\n<p>Construction of the engineering structures will follow, while taking care to maintain traffic on the main route of the X2. The drainage and roadway development operations will then be started, with the installation of footbridges to ensure the safety of passengers in relation to road traffic, particularly at the new stations.<\/p>\n\n\n\n<p>The choice of rolling stock is crucial and must be made at the beginning of the project to anticipate possible delays. The necessary training for drivers and maintainers will start at the beginning of the project and will be carried out on the section already in operation between Barcelona and La Medina, allowing the equipment to be brought up to standard and the technicians to be trained in maintenance.<\/p>\n\n\n\n<p>The recruitment and training of personnel, such as drivers, maintainers and operators, should begin 3 years before the new line is commissioned.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conclusion<\/h2>\n\n\n\n<p>This project provides a response to the need for increased mobility between the suburbs and city center, with a public transport solution adapted to growing demand. Financed through a public-private partnership (PPP), this regional project will revitalize the Tunis public transport system. Together with the R\u00e9seau Ferroviaire Rapide (RFR), the extension will improve the capital\u2019s connectivity and enhance its transport network.<\/p>\n\n\n\n<p>Development of Line 2 will contribute to upgrading neglected areas exposed to automobile pollution. The extension towards Ennasr will serve 50,000 additional inhabitants, considerably improving travel in the North and Northwest of Tunis, as well as in neighboring municipalities. It will facilitate the conversion and development of areas undergoing change, thereby boosting attractiveness and development.<\/p>\n\n\n\n<p>However, the viability of the project is threatened by the current economic crisis in Tunisia, putting the country on the verge of default. Its high level of debt makes it difficult to obtain international financing unless there is positive political action in response to the IMF proposal. Political and economic measures will be needed to ensure the successful completion of the project and contribute to the country\u2019s economic recovery.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This project is part of the Specialized Master\u00ae in Rail and Urban Transport Systems at \u00c9cole nationale des ponts et [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":5536,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_related_content_post":[],"_related_content_subject":[936,692],"_related_content_author":[],"_related_content_category":[1721],"_related_content_folder":[6454],"_excerpt":"<p class=\"MsoNormal\" style=\"text-align:justify\"><span lang=\"EN-US\" style=\"mso-ansi-language:EN-US\"><\/span><\/p>The population of the Greater Tunis region of the capital of Tunisia is constantly increasing, bringing potential for future economic growth. However, it suffers from a dilapidated public transportation network. In particular, the light rail network, currently managed by Transtu, is poorly operated and maintained. In addition, the political framework in Tunisia is highly complex and continues to give priority to road projects. In this context, we study the project to extend Line 2 to Ennasr, an area not currently connected by light rail, but by bus only. The intention of the project is to provide a solution to the mobility problem in an urban center suffering from traffic congestion. Furthermore, we take the opportunity of this project to bring new life to the system. By modernizing the infrastructure and equipment, we aim to make the urban transport system more attractive so that the inhabitants of Greater Tunis embrace their light rail system<span lang=\"EN-US\" style=\"mso-ansi-language:EN-US\">.<\/span>","_duration":10,"_manual_duration":false,"footnotes":""},"article-types":[13],"class_list":["post-5979","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","article-types-article"],"has_blocks":true,"block_data":[{"blockName":"enpc\/excerpt","attrs":{"lock":[],"metadata":[],"className":"","style":""},"innerBlocks":[],"innerHTML":"","innerContent":[],"rendered":""},{"blockName":"core\/image","attrs":{"id":5536,"sizeSlug":"large","linkDestination":"none","align":"wide","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-767x1024.jpg","alt":"","caption":"Avenue Habib Bourguiba Tunis \u00a9 Bilal Ayadi, 2022","lightbox":[],"title":"","href":"","rel":"","linkClass":"","width":"","height":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image alignwide size-large","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image alignwide size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-767x1024.jpg\" alt=\"\" class=\"wp-image-5536\"\/><figcaption class=\"wp-element-caption\">Avenue Habib Bourguiba Tunis \u00a9 Bilal Ayadi, 2022<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image alignwide size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-767x1024.jpg\" alt=\"\" class=\"wp-image-5536\"\/><figcaption class=\"wp-element-caption\">Avenue Habib Bourguiba Tunis \u00a9 Bilal Ayadi, 2022<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image alignwide size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-767x1024.jpg\" alt=\"\" class=\"wp-image-5536\"\/><figcaption class=\"wp-element-caption\">Avenue Habib Bourguiba Tunis \u00a9 Bilal Ayadi, 2022<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"style":{"elements":{"link":{"color":{"text":"var:preset|color|white"}}}},"backgroundColor":"light-blue","textColor":"white","fontSize":"small","align":"","content":"This project is part of the Specialized Master\u00ae in Rail and Urban Transport Systems at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.The students' work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.An English summary of the work is published each year in the yearbook on the MS website.- Federico AntoniazziWork by : Imen Ben Hamida Slim, Ad\u00e8le Darde, Marine Ferrero, Guillaume Morbin, Fran\u00e7ois Phelippeau","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size","gradient":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p class=\"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size\">This project is part of the<strong> Specialized Master\u00ae in Rail and Urban Transport Systems <\/strong>at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.<br><br>The students' work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.<br><br>An English summary of the work is published each year in the yearbook on the MS website.- Federico Antoniazzi<br><br><strong>Work by : Imen Ben Hamida Slim, Ad\u00e8le Darde, Marine Ferrero, Guillaume Morbin, Fran\u00e7ois Phelippeau<\/strong><\/p>\n","innerContent":["\n<p class=\"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size\">This project is part of the<strong> Specialized Master\u00ae in Rail and Urban Transport Systems <\/strong>at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.<br><br>The students' work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.<br><br>An English summary of the work is published each year in the yearbook on the MS website.- Federico Antoniazzi<br><br><strong>Work by : Imen Ben Hamida Slim, Ad\u00e8le Darde, Marine Ferrero, Guillaume Morbin, Fran\u00e7ois Phelippeau<\/strong><\/p>\n"],"rendered":"\n<p class=\"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size\">This project is part of the<strong> Specialized Master\u00ae in Rail and Urban Transport Systems <\/strong>at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.<br><br>The students' work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.<br><br>An English summary of the work is published each year in the yearbook on the MS website.- Federico Antoniazzi<br><br><strong>Work by : Imen Ben Hamida Slim, Ad\u00e8le Darde, Marine Ferrero, Guillaume Morbin, Fran\u00e7ois Phelippeau<\/strong><\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Diagnostic and challenges of the project","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Diagnostic and challenges of the project<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Diagnostic and challenges of the project<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Diagnostic and challenges of the project<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The Ennasr district of the Greater Tunis region is a residential area connected to the region's economic activities. Ennasr I and II mainly comprise local shops and services, but with very few public green spaces and cultural activities.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The Ennasr district of the Greater Tunis region is a residential area connected to the region's economic activities. Ennasr I and II mainly comprise local shops and services, but with very few public green spaces and cultural activities.<\/p>\n","innerContent":["\n<p>The Ennasr district of the Greater Tunis region is a residential area connected to the region's economic activities. Ennasr I and II mainly comprise local shops and services, but with very few public green spaces and cultural activities.<\/p>\n"],"rendered":"\n<p>The Ennasr district of the Greater Tunis region is a residential area connected to the region's economic activities. Ennasr I and II mainly comprise local shops and services, but with very few public green spaces and cultural activities.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5539,"width":"745px","height":"495px","sizeSlug":"large","linkDestination":"none","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-1024x680.jpg","alt":"","caption":"Avenue H\u00e9di Nouira, heart of Ennasr \u00a9 Citizen59, 2010, CC BY-SA 3.0 (source: Wikimedia Commons).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"align":"","className":"wp-block-image size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-1024x680.jpg\" alt=\"\" class=\"wp-image-5539\" style=\"width:745px;height:495px\"\/><figcaption class=\"wp-element-caption\"><em>Avenue H\u00e9di Nouira, heart of Ennasr<\/em> \u00a9 Citizen59, 2010, CC BY-SA 3.0 (source: Wikimedia Commons).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-1024x680.jpg\" alt=\"\" class=\"wp-image-5539\" style=\"width:745px;height:495px\"\/><figcaption class=\"wp-element-caption\"><em>Avenue H\u00e9di Nouira, heart of Ennasr<\/em> \u00a9 Citizen59, 2010, CC BY-SA 3.0 (source: Wikimedia Commons).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure1-1024x680.jpg\" alt=\"\" class=\"wp-image-5539\" style=\"width:745px;height:495px\"\/><figcaption class=\"wp-element-caption\"><em>Avenue H\u00e9di Nouira, heart of Ennasr<\/em> \u00a9 Citizen59, 2010, CC BY-SA 3.0 (source: Wikimedia Commons).<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><\/p>\n","innerContent":["\n<p><\/p>\n"],"rendered":"\n<p><\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Residents suffer from a shortage of public transport. The system in Tunisia is characterized by excessive centralization but a lack of coordination between actors. Transport policies often give priority to road projects over urban transport.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Residents suffer from a shortage of public transport. The system in Tunisia is characterized by excessive centralization but a lack of coordination between actors. Transport policies often give priority to road projects over urban transport.<\/p>\n","innerContent":["\n<p>Residents suffer from a shortage of public transport. The system in Tunisia is characterized by excessive centralization but a lack of coordination between actors. Transport policies often give priority to road projects over urban transport.<\/p>\n"],"rendered":"\n<p>Residents suffer from a shortage of public transport. The system in Tunisia is characterized by excessive centralization but a lack of coordination between actors. Transport policies often give priority to road projects over urban transport.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Collaboration between the Ministry of Transport and the Ministry of Equipment, Housing and Land Use Planning is unbalanced, resulting in a shortfall in urban transport investment.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Collaboration between the Ministry of Transport and the Ministry of Equipment, Housing and Land Use Planning is unbalanced, resulting in a shortfall in urban transport investment.<\/p>\n","innerContent":["\n<p>Collaboration between the Ministry of Transport and the Ministry of Equipment, Housing and Land Use Planning is unbalanced, resulting in a shortfall in urban transport investment.<\/p>\n"],"rendered":"\n<p>Collaboration between the Ministry of Transport and the Ministry of Equipment, Housing and Land Use Planning is unbalanced, resulting in a shortfall in urban transport investment.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Greater Tunis has various modes of transport, including a light rail system operated by public company Transtu. However, lack of maintenance reduces train availability and thus the capacity of the network. A major transport project is under construction in the region, the R\u00e9seau Ferroviaire Rapide (RFR, Rapid Rail Network), with the aim of connecting the suburbs to the center of Tunis.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Greater Tunis has various modes of transport, including a light rail system operated by public company Transtu. However, lack of maintenance reduces train availability and thus the capacity of the network. A major transport project is under construction in the region, the <em>R\u00e9seau Ferroviaire Rapide<\/em> (RFR, Rapid Rail Network), with the aim of connecting the suburbs to the center of Tunis.<\/p>\n","innerContent":["\n<p>Greater Tunis has various modes of transport, including a light rail system operated by public company Transtu. However, lack of maintenance reduces train availability and thus the capacity of the network. A major transport project is under construction in the region, the <em>R\u00e9seau Ferroviaire Rapide<\/em> (RFR, Rapid Rail Network), with the aim of connecting the suburbs to the center of Tunis.<\/p>\n"],"rendered":"\n<p>Greater Tunis has various modes of transport, including a light rail system operated by public company Transtu. However, lack of maintenance reduces train availability and thus the capacity of the network. A major transport project is under construction in the region, the <em>R\u00e9seau Ferroviaire Rapide<\/em> (RFR, Rapid Rail Network), with the aim of connecting the suburbs to the center of Tunis.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The initiative to extend Line 2 of the Tunis light rail system aims to improve the situation, but faces internal and external challenges.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The initiative to extend Line 2 of the Tunis light rail system aims to improve the situation, but faces internal and external challenges.<\/p>\n","innerContent":["\n<p>The initiative to extend Line 2 of the Tunis light rail system aims to improve the situation, but faces internal and external challenges.<\/p>\n"],"rendered":"\n<p>The initiative to extend Line 2 of the Tunis light rail system aims to improve the situation, but faces internal and external challenges.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Route selection","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Route selection<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Route selection<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Route selection<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"4 scenarios have been developed:","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>4 scenarios have been developed:<\/p>\n","innerContent":["\n<p>4 scenarios have been developed:<\/p>\n"],"rendered":"\n<p>4 scenarios have been developed:<\/p>\n"},{"blockName":"core\/list","attrs":{"ordered":true,"type":"1","values":"\n\n\n\n\n\n","start":0,"reversed":false,"placeholder":"","lock":[],"metadata":[],"className":"wp-block-list","style":"list-style-type:1","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Extension of the existing line to connect the districts of Ennasr I and II to the center of Tunis","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Extension of the existing line to connect the districts of Ennasr I and II to the center of Tunis<\/li>\n","innerContent":["\n<li>Extension of the existing line to connect the districts of Ennasr I and II to the center of Tunis<\/li>\n"],"rendered":"\n<li>Extension of the existing line to connect the districts of Ennasr I and II to the center of Tunis<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Creation of a branch on Line 2, with La Jeunesse as a common station, to serve the districts of Ennasr","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Creation of a branch on Line 2, with La Jeunesse as a common station, to serve the districts of Ennasr<\/li>\n","innerContent":["\n<li>Creation of a branch on Line 2, with La Jeunesse as a common station, to serve the districts of Ennasr<\/li>\n"],"rendered":"\n<li>Creation of a branch on Line 2, with La Jeunesse as a common station, to serve the districts of Ennasr<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Extension of Line 5 along the X20 expressway","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Extension of Line 5 along the X20 expressway<\/li>\n","innerContent":["\n<li>Extension of Line 5 along the X20 expressway<\/li>\n"],"rendered":"\n<li>Extension of Line 5 along the X20 expressway<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Creation of a BRT line linking Place de la R\u00e9publique to the Ennasr districts.","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Creation of a BRT line linking Place de la R\u00e9publique to the Ennasr districts.<\/li>\n","innerContent":["\n<li>Creation of a BRT line linking Place de la R\u00e9publique to the Ennasr districts.<\/li>\n"],"rendered":"\n<li>Creation of a BRT line linking Place de la R\u00e9publique to the Ennasr districts.<\/li>\n"}],"innerHTML":"\n<ol style=\"list-style-type:1\" class=\"wp-block-list\">\n\n\n\n\n\n<\/ol>\n","innerContent":["\n<ol style=\"list-style-type:1\" class=\"wp-block-list\">",null,"\n\n",null,"\n\n",null,"\n\n",null,"<\/ol>\n"],"rendered":"\n<ol style=\"list-style-type:1\" class=\"wp-block-list\">\n<li>Extension of the existing line to connect the districts of Ennasr I and II to the center of Tunis<\/li>\n\n\n\n<li>Creation of a branch on Line 2, with La Jeunesse as a common station, to serve the districts of Ennasr<\/li>\n\n\n\n<li>Extension of Line 5 along the X20 expressway<\/li>\n\n\n\n<li>Creation of a BRT line linking Place de la R\u00e9publique to the Ennasr districts.<\/li>\n<\/ol>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"A multicriteria analysis was conducted to evaluate the scenarios. Scenarios 3 and 4 were rejected due to their uncompetitive travel times and the additional investments required.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>A multicriteria analysis was conducted to evaluate the scenarios. Scenarios 3 and 4 were rejected due to their uncompetitive travel times and the additional investments required.<\/p>\n","innerContent":["\n<p>A multicriteria analysis was conducted to evaluate the scenarios. Scenarios 3 and 4 were rejected due to their uncompetitive travel times and the additional investments required.<\/p>\n"],"rendered":"\n<p>A multicriteria analysis was conducted to evaluate the scenarios. Scenarios 3 and 4 were rejected due to their uncompetitive travel times and the additional investments required.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The analysis identified several arguments in favor of Scenario 2. It provides better service to residential and employment areas, has a sustainable business model with reduced operating costs, and allows for a concentration of traffic in the center of Tunis. Although it has a larger environmental footprint, it carries more passengers with fewer trains.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The analysis identified several arguments in favor of Scenario 2. It provides better service to residential and employment areas, has a sustainable business model with reduced operating costs, and allows for a concentration of traffic in the center of Tunis. Although it has a larger environmental footprint, it carries more passengers with fewer trains.<\/p>\n","innerContent":["\n<p>The analysis identified several arguments in favor of Scenario 2. It provides better service to residential and employment areas, has a sustainable business model with reduced operating costs, and allows for a concentration of traffic in the center of Tunis. Although it has a larger environmental footprint, it carries more passengers with fewer trains.<\/p>\n"],"rendered":"\n<p>The analysis identified several arguments in favor of Scenario 2. It provides better service to residential and employment areas, has a sustainable business model with reduced operating costs, and allows for a concentration of traffic in the center of Tunis. Although it has a larger environmental footprint, it carries more passengers with fewer trains.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The final route involves the creation of a branch on light metro Line 2 along Avenue H\u00e9di Nouira, with a terminus located in the first third of the avenue due to the steep slope.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The final route involves the creation of a branch on light metro Line 2 along Avenue H\u00e9di Nouira, with a terminus located in the first third of the avenue due to the steep slope.<\/p>\n","innerContent":["\n<p>The final route involves the creation of a branch on light metro Line 2 along Avenue H\u00e9di Nouira, with a terminus located in the first third of the avenue due to the steep slope.<\/p>\n"],"rendered":"\n<p>The final route involves the creation of a branch on light metro Line 2 along Avenue H\u00e9di Nouira, with a terminus located in the first third of the avenue due to the steep slope.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5541,"sizeSlug":"large","linkDestination":"none","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-1024x724.png","alt":"","caption":"Route path selected to serve Ennasr \u00a9 Ad\u00e8le Darde, 2023 (map data: OpenStreetMap contributors).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","width":"","height":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"align":"","className":"wp-block-image size-large","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-1024x724.png\" alt=\"\" class=\"wp-image-5541\"\/><figcaption class=\"wp-element-caption\">Route path selected to serve Ennasr \u00a9 Ad\u00e8le Darde, 2023 (map data: OpenStreetMap contributors).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-1024x724.png\" alt=\"\" class=\"wp-image-5541\"\/><figcaption class=\"wp-element-caption\">Route path selected to serve Ennasr \u00a9 Ad\u00e8le Darde, 2023 (map data: OpenStreetMap contributors).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure2-1024x724.png\" alt=\"\" class=\"wp-image-5541\"\/><figcaption class=\"wp-element-caption\">Route path selected to serve Ennasr \u00a9 Ad\u00e8le Darde, 2023 (map data: OpenStreetMap contributors).<\/figcaption><\/figure>\n"},{"blockName":"core\/heading","attrs":{"textAlign":"","content":"Passenger flow forecast","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading\">Passenger flow forecast<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading\">Passenger flow forecast<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading\">Passenger flow forecast<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Once the final route has been selected, passenger flows can be estimated. The analysis consists in defining a catchment area of 500 meters around each station. The number of people inside each catchment area is then inferred from the demographic data, corrected by a forecast factor (target 2044). This yields a number of 84,000 persons. Under the assumption that only part of the active population takes public transportation, the predicted passenger flow is 25,600 passengers per day and per direction.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Once the final route has been selected, passenger flows can be estimated. The analysis consists in defining a catchment area of 500 meters around each station. The number of people inside each catchment area is then inferred from the demographic data, corrected by a forecast factor (target 2044). This yields a number of 84,000 persons. Under the assumption that only part of the active population takes public transportation, the predicted passenger flow is 25,600 passengers per day and per direction.<\/p>\n","innerContent":["\n<p>Once the final route has been selected, passenger flows can be estimated. The analysis consists in defining a catchment area of 500 meters around each station. The number of people inside each catchment area is then inferred from the demographic data, corrected by a forecast factor (target 2044). This yields a number of 84,000 persons. Under the assumption that only part of the active population takes public transportation, the predicted passenger flow is 25,600 passengers per day and per direction.<\/p>\n"],"rendered":"\n<p>Once the final route has been selected, passenger flows can be estimated. The analysis consists in defining a catchment area of 500 meters around each station. The number of people inside each catchment area is then inferred from the demographic data, corrected by a forecast factor (target 2044). This yields a number of 84,000 persons. Under the assumption that only part of the active population takes public transportation, the predicted passenger flow is 25,600 passengers per day and per direction.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5543,"width":"582px","height":"328px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-1024x577.png","alt":"","caption":" Catchment area around each station of the extension \u00a9 Guillaume Morbin, 2023 (data: Institut National de la Statistique de Tunisie; map data: QGIS).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-1024x577.png\" alt=\"\" class=\"wp-image-5543\" style=\"width:582px;height:328px\"\/><figcaption class=\"wp-element-caption\"> Catchment area around each station of the extension \u00a9 Guillaume Morbin, 2023 (data: Institut National de la Statistique de Tunisie; map data: QGIS).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-1024x577.png\" alt=\"\" class=\"wp-image-5543\" style=\"width:582px;height:328px\"\/><figcaption class=\"wp-element-caption\"> Catchment area around each station of the extension \u00a9 Guillaume Morbin, 2023 (data: Institut National de la Statistique de Tunisie; map data: QGIS).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure3-1024x577.png\" alt=\"\" class=\"wp-image-5543\" style=\"width:582px;height:328px\"\/><figcaption class=\"wp-element-caption\"> Catchment area around each station of the extension \u00a9 Guillaume Morbin, 2023 (data: Institut National de la Statistique de Tunisie; map data: QGIS).<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The breakdown of passengers over the day is projected based on a typical curve, with peak periods of 2 hours in the morning and 3 hours in the evening, and flatter traffic in between. This results in traffic of 5,300 PPHPD.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The breakdown of passengers over the day is projected based on a typical curve, with peak periods of 2 hours in the morning and 3 hours in the evening, and flatter traffic in between. This results in traffic of 5,300 PPHPD.<\/p>\n","innerContent":["\n<p>The breakdown of passengers over the day is projected based on a typical curve, with peak periods of 2 hours in the morning and 3 hours in the evening, and flatter traffic in between. This results in traffic of 5,300 PPHPD.<\/p>\n"],"rendered":"\n<p>The breakdown of passengers over the day is projected based on a typical curve, with peak periods of 2 hours in the morning and 3 hours in the evening, and flatter traffic in between. This results in traffic of 5,300 PPHPD.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5547,"width":"554px","height":"312px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3-1024x576.jpg","alt":"","caption":"Breakdown of passenger flows over the day \u00a9 Guillaume Morbin, 2023","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3-1024x576.jpg\" alt=\"\" class=\"wp-image-5547\" style=\"width:554px;height:312px\"\/><figcaption class=\"wp-element-caption\">Breakdown of passenger flows over the day \u00a9 Guillaume Morbin, 2023<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3-1024x576.jpg\" alt=\"\" class=\"wp-image-5547\" style=\"width:554px;height:312px\"\/><figcaption class=\"wp-element-caption\">Breakdown of passenger flows over the day \u00a9 Guillaume Morbin, 2023<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/2024_DDAP_outilsmediation-3-1024x576.jpg\" alt=\"\" class=\"wp-image-5547\" style=\"width:554px;height:312px\"\/><figcaption class=\"wp-element-caption\">Breakdown of passenger flows over the day \u00a9 Guillaume Morbin, 2023<\/figcaption><\/figure>\n"},{"blockName":"core\/heading","attrs":{"textAlign":"","content":"Description of the route ","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading\">Description of the route <\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading\">Description of the route <\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading\">Description of the route <\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Route geometry","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><strong>Route geometry<\/strong><\/p>\n","innerContent":["\n<p><strong>Route geometry<\/strong><\/p>\n"],"rendered":"\n<p><strong>Route geometry<\/strong><\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The constraints that guided the route design are mainly road intersections. 8 roads intercepting the project have been identified, as well as the X2 expressway that runs alongside it.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The constraints that guided the route design are mainly road intersections. 8 roads intercepting the project have been identified, as well as the X2 expressway that runs alongside it.<\/p>\n","innerContent":["\n<p>The constraints that guided the route design are mainly road intersections. 8 roads intercepting the project have been identified, as well as the X2 expressway that runs alongside it.<\/p>\n"],"rendered":"\n<p>The constraints that guided the route design are mainly road intersections. 8 roads intercepting the project have been identified, as well as the X2 expressway that runs alongside it.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"In addition, a major creek runs laterally along the corridor, necessitating the provision of adequate drainage systems.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>In addition, a major creek runs laterally along the corridor, necessitating the provision of adequate drainage systems.<\/p>\n","innerContent":["\n<p>In addition, a major creek runs laterally along the corridor, necessitating the provision of adequate drainage systems.<\/p>\n"],"rendered":"\n<p>In addition, a major creek runs laterally along the corridor, necessitating the provision of adequate drainage systems.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5549,"width":"456px","height":"520px","sizeSlug":"full","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure5.png","alt":"","caption":"Route integration along Route X2 with crossing solutions \u00a9 Imen Ben Hamida Slim, 2023 (map data: OpenStreetMap contributors).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-full is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure5.png\" alt=\"\" class=\"wp-image-5549\" style=\"width:456px;height:520px\"\/><figcaption class=\"wp-element-caption\">Route integration along Route X2 with crossing solutions \u00a9 Imen Ben Hamida Slim, 2023 (map data: OpenStreetMap contributors).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure5.png\" alt=\"\" class=\"wp-image-5549\" style=\"width:456px;height:520px\"\/><figcaption class=\"wp-element-caption\">Route integration along Route X2 with crossing solutions \u00a9 Imen Ben Hamida Slim, 2023 (map data: OpenStreetMap contributors).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure5.png\" alt=\"\" class=\"wp-image-5549\" style=\"width:456px;height:520px\"\/><figcaption class=\"wp-element-caption\">Route integration along Route X2 with crossing solutions \u00a9 Imen Ben Hamida Slim, 2023 (map data: OpenStreetMap contributors).<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><\/p>\n","innerContent":["\n<p><\/p>\n"],"rendered":"\n<p><\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Although the terrain is mostly relatively flat, the northern section has steep gradients exceeding the traction capacity of the tram.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Although the terrain is mostly relatively flat, the northern section has steep gradients exceeding the traction capacity of the tram.<\/p>\n","innerContent":["\n<p>Although the terrain is mostly relatively flat, the northern section has steep gradients exceeding the traction capacity of the tram.<\/p>\n"],"rendered":"\n<p>Although the terrain is mostly relatively flat, the northern section has steep gradients exceeding the traction capacity of the tram.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The route presents three narrow radii at the junction with Route X. To reduce the crossing of Route X2, a curve and counter-curve with a 30m radius were included. For the bend between Road X2 and Avenue H\u00e9di Nouira, the roundabout is crossed in the middle to optimize visibility and avoid expropriations in a very dense urban environment.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The route presents three narrow radii at the junction with Route X. To reduce the crossing of Route X2, a curve and counter-curve with a 30m radius were included. For the bend between Road X2 and Avenue H\u00e9di Nouira, the roundabout is crossed in the middle to optimize visibility and avoid expropriations in a very dense urban environment.<\/p>\n","innerContent":["\n<p>The route presents three narrow radii at the junction with Route X. To reduce the crossing of Route X2, a curve and counter-curve with a 30m radius were included. For the bend between Road X2 and Avenue H\u00e9di Nouira, the roundabout is crossed in the middle to optimize visibility and avoid expropriations in a very dense urban environment.<\/p>\n"],"rendered":"\n<p>The route presents three narrow radii at the junction with Route X. To reduce the crossing of Route X2, a curve and counter-curve with a 30m radius were included. For the bend between Road X2 and Avenue H\u00e9di Nouira, the roundabout is crossed in the middle to optimize visibility and avoid expropriations in a very dense urban environment.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Route characteristics","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><strong>Route characteristics<\/strong><\/p>\n","innerContent":["\n<p><strong>Route characteristics<\/strong><\/p>\n"],"rendered":"\n<p><strong>Route characteristics<\/strong><\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The route is a 5.6 km extension of light metro Line 2.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The route is a 5.6 km extension of light metro Line 2.<\/p>\n","innerContent":["\n<p>The route is a 5.6 km extension of light metro Line 2.<\/p>\n"],"rendered":"\n<p>The route is a 5.6 km extension of light metro Line 2.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The fork is created after La Jeunesse station by inserting turnouts onto the existing tracks. The tracks then follow Route X2 along its east side as far as Menzah IV station. They then cross Route X (Avenue 14 Janvier 2011) and part of Route X2 (Avenue 1 Septembre 1969) over a viaduct leading to the central reservation of Route X2. The route then continues along the axis of Route X2 to Ennasr station. The overpass crosses Route X20, bends to run parallel to the Route X20 bypass on Avenue H\u00e9di Nouira, and stops some 500m east of the X2-X20 intersection.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The fork is created after La Jeunesse station by inserting turnouts onto the existing tracks. The tracks then follow Route X2 along its east side as far as Menzah IV station. They then cross Route X (Avenue 14 Janvier 2011) and part of Route X2 (Avenue 1 Septembre 1969) over a viaduct leading to the central reservation of Route X2. The route then continues along the axis of Route X2 to Ennasr station. The overpass crosses Route X20, bends to run parallel to the Route X20 bypass on Avenue H\u00e9di Nouira, and stops some 500m east of the X2-X20 intersection.<\/p>\n","innerContent":["\n<p>The fork is created after La Jeunesse station by inserting turnouts onto the existing tracks. The tracks then follow Route X2 along its east side as far as Menzah IV station. They then cross Route X (Avenue 14 Janvier 2011) and part of Route X2 (Avenue 1 Septembre 1969) over a viaduct leading to the central reservation of Route X2. The route then continues along the axis of Route X2 to Ennasr station. The overpass crosses Route X20, bends to run parallel to the Route X20 bypass on Avenue H\u00e9di Nouira, and stops some 500m east of the X2-X20 intersection.<\/p>\n"],"rendered":"\n<p>The fork is created after La Jeunesse station by inserting turnouts onto the existing tracks. The tracks then follow Route X2 along its east side as far as Menzah IV station. They then cross Route X (Avenue 14 Janvier 2011) and part of Route X2 (Avenue 1 Septembre 1969) over a viaduct leading to the central reservation of Route X2. The route then continues along the axis of Route X2 to Ennasr station. The overpass crosses Route X20, bends to run parallel to the Route X20 bypass on Avenue H\u00e9di Nouira, and stops some 500m east of the X2-X20 intersection.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The planned terminus is located on the north side of Route X20, enabling the line to be extended towards the center of Ennasr along Avenue H\u00e9di Nouira.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The planned terminus is located on the north side of Route X20, enabling the line to be extended towards the center of Ennasr along Avenue H\u00e9di Nouira.<\/p>\n","innerContent":["\n<p>The planned terminus is located on the north side of Route X20, enabling the line to be extended towards the center of Ennasr along Avenue H\u00e9di Nouira.<\/p>\n"],"rendered":"\n<p>The planned terminus is located on the north side of Route X20, enabling the line to be extended towards the center of Ennasr along Avenue H\u00e9di Nouira.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Bridges","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><strong>Bridges<\/strong><\/p>\n","innerContent":["\n<p><strong>Bridges<\/strong><\/p>\n"],"rendered":"\n<p><strong>Bridges<\/strong><\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"5 concrete bridges are planned at the most important intersections with the highest traffic volumes, to maintain commercial speed and avoid generating road traffic congestion.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>5 concrete bridges are planned at the most important intersections with the highest traffic volumes, to maintain commercial speed and avoid generating road traffic congestion.<\/p>\n","innerContent":["\n<p>5 concrete bridges are planned at the most important intersections with the highest traffic volumes, to maintain commercial speed and avoid generating road traffic congestion.<\/p>\n"],"rendered":"\n<p>5 concrete bridges are planned at the most important intersections with the highest traffic volumes, to maintain commercial speed and avoid generating road traffic congestion.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"These include 2 major viaducts with respective lengths of 350m and 120m, and 3 slab bridges. There are also 3 level crossings. The type of structure for the viaducts is a U-shaped precast, prestressed concrete deck. This type of structure has many advantages, including its aesthetic appeal, speed of execution, possibility of cross-sections greater than 25m, low cost and safety features.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>These include 2 major viaducts with respective lengths of 350m and 120m, and 3 slab bridges. There are also 3 level crossings. The type of structure for the viaducts is a U-shaped precast, prestressed concrete deck. This type of structure has many advantages, including its aesthetic appeal, speed of execution, possibility of cross-sections greater than 25m, low cost and safety features.<\/p>\n","innerContent":["\n<p>These include 2 major viaducts with respective lengths of 350m and 120m, and 3 slab bridges. There are also 3 level crossings. The type of structure for the viaducts is a U-shaped precast, prestressed concrete deck. This type of structure has many advantages, including its aesthetic appeal, speed of execution, possibility of cross-sections greater than 25m, low cost and safety features.<\/p>\n"],"rendered":"\n<p>These include 2 major viaducts with respective lengths of 350m and 120m, and 3 slab bridges. There are also 3 level crossings. The type of structure for the viaducts is a U-shaped precast, prestressed concrete deck. This type of structure has many advantages, including its aesthetic appeal, speed of execution, possibility of cross-sections greater than 25m, low cost and safety features.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Stations","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><strong>Stations<\/strong><\/p>\n","innerContent":["\n<p><strong>Stations<\/strong><\/p>\n"],"rendered":"\n<p><strong>Stations<\/strong><\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Station location choices are based on proximity to neighborhoods, location of intersections and bridges, normative recommendations, and existing characteristics. They are also designed to enhance intermodality for pedestrians and cyclists, and link the districts separated by Route X2.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Station location choices are based on proximity to neighborhoods, location of intersections and bridges, normative recommendations, and existing characteristics. They are also designed to enhance intermodality for pedestrians and cyclists, and link the districts separated by Route X2.<\/p>\n","innerContent":["\n<p>Station location choices are based on proximity to neighborhoods, location of intersections and bridges, normative recommendations, and existing characteristics. They are also designed to enhance intermodality for pedestrians and cyclists, and link the districts separated by Route X2.<\/p>\n"],"rendered":"\n<p>Station location choices are based on proximity to neighborhoods, location of intersections and bridges, normative recommendations, and existing characteristics. They are also designed to enhance intermodality for pedestrians and cyclists, and link the districts separated by Route X2.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5551,"width":"586px","height":"349px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6-1024x609.png","alt":"","caption":"Integration of stations and pedestrian pathways across Route X2 \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023 (map data: Google Earth).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6-1024x609.png\" alt=\"\" class=\"wp-image-5551\" style=\"width:586px;height:349px\"\/><figcaption class=\"wp-element-caption\">Integration of stations and pedestrian pathways across Route X2 \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023 (map data: Google Earth).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6-1024x609.png\" alt=\"\" class=\"wp-image-5551\" style=\"width:586px;height:349px\"\/><figcaption class=\"wp-element-caption\">Integration of stations and pedestrian pathways across Route X2 \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023 (map data: Google Earth).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure6-1024x609.png\" alt=\"\" class=\"wp-image-5551\" style=\"width:586px;height:349px\"\/><figcaption class=\"wp-element-caption\">Integration of stations and pedestrian pathways across Route X2 \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023 (map data: Google Earth).<\/figcaption><\/figure>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Infrastructure and trackside equipment","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Infrastructure and trackside equipment<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Infrastructure and trackside equipment<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Infrastructure and trackside equipment<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"A track compatible with existing trams and with optimized costs","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><strong>A track compatible with existing trams and with optimized costs<\/strong><\/p>\n","innerContent":["\n<p><strong>A track compatible with existing trams and with optimized costs<\/strong><\/p>\n"],"rendered":"\n<p><strong>A track compatible with existing trams and with optimized costs<\/strong><\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The extension will be connected to the existing Line 2. To ensure interoperability with the existing system, the tracks will have a standard gauge of 1,435. Track installation will be integrated into the roadway in road intersection areas. Elsewhere, track installation will involve laying ballast track to ensure lower project costs.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The extension will be connected to the existing Line 2. To ensure interoperability with the existing system, the tracks will have a standard gauge of 1,435. Track installation will be integrated into the roadway in road intersection areas. Elsewhere, track installation will involve laying ballast track to ensure lower project costs.<\/p>\n","innerContent":["\n<p>The extension will be connected to the existing Line 2. To ensure interoperability with the existing system, the tracks will have a standard gauge of 1,435. Track installation will be integrated into the roadway in road intersection areas. Elsewhere, track installation will involve laying ballast track to ensure lower project costs.<\/p>\n"],"rendered":"\n<p>The extension will be connected to the existing Line 2. To ensure interoperability with the existing system, the tracks will have a standard gauge of 1,435. Track installation will be integrated into the roadway in road intersection areas. Elsewhere, track installation will involve laying ballast track to ensure lower project costs.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Modern systems to optimize availability and productivity","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><strong>Modern systems to optimize availability and productivity<\/strong><\/p>\n","innerContent":["\n<p><strong>Modern systems to optimize availability and productivity<\/strong><\/p>\n"],"rendered":"\n<p><strong>Modern systems to optimize availability and productivity<\/strong><\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Modernization of the control-command and maintenance centers will contribute to the efficiency and productivity of Line 2. The trains and track will be equipped with locating equipment, communication devices and crossroad priority systems. Device communication will allow system monitoring to maintain increased overall availability. Train locations will be fed to the operation control center to manage train operations and passenger information systems. Crossroad priority systems will be studied in conjunction with road light signals with the aim of improving commercial speeds.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Modernization of the control-command and maintenance centers will contribute to the efficiency and productivity of Line 2. The trains and track will be equipped with locating equipment, communication devices and crossroad priority systems. Device communication will allow system monitoring to maintain increased overall availability. Train locations will be fed to the operation control center to manage train operations and passenger information systems. Crossroad priority systems will be studied in conjunction with road light signals with the aim of improving commercial speeds.<\/p>\n","innerContent":["\n<p>Modernization of the control-command and maintenance centers will contribute to the efficiency and productivity of Line 2. The trains and track will be equipped with locating equipment, communication devices and crossroad priority systems. Device communication will allow system monitoring to maintain increased overall availability. Train locations will be fed to the operation control center to manage train operations and passenger information systems. Crossroad priority systems will be studied in conjunction with road light signals with the aim of improving commercial speeds.<\/p>\n"],"rendered":"\n<p>Modernization of the control-command and maintenance centers will contribute to the efficiency and productivity of Line 2. The trains and track will be equipped with locating equipment, communication devices and crossroad priority systems. Device communication will allow system monitoring to maintain increased overall availability. Train locations will be fed to the operation control center to manage train operations and passenger information systems. Crossroad priority systems will be studied in conjunction with road light signals with the aim of improving commercial speeds.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Attractive, efficient rolling stock","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Attractive, efficient rolling stock<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Attractive, efficient rolling stock<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Attractive, efficient rolling stock<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"34 new trams will connect the Ennasr district to Tunis city center. Their final design will be chosen by the local population to involve them in the project. Capacity, comfort, and performance are expected to ensure the attractiveness, efficiency and productivity of the system. When operated in double units, the trains can accommodate 600 passengers. They will be interoperable with the existing light metro system and therefore contribute to its the renovation.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>34 new trams will connect the Ennasr district to Tunis city center. Their final design will be chosen by the local population to involve them in the project. Capacity, comfort, and performance are expected to ensure the attractiveness, efficiency and productivity of the system. When operated in double units, the trains can accommodate 600 passengers. They will be interoperable with the existing light metro system and therefore contribute to its the renovation.<\/p>\n","innerContent":["\n<p>34 new trams will connect the Ennasr district to Tunis city center. Their final design will be chosen by the local population to involve them in the project. Capacity, comfort, and performance are expected to ensure the attractiveness, efficiency and productivity of the system. When operated in double units, the trains can accommodate 600 passengers. They will be interoperable with the existing light metro system and therefore contribute to its the renovation.<\/p>\n"],"rendered":"\n<p>34 new trams will connect the Ennasr district to Tunis city center. Their final design will be chosen by the local population to involve them in the project. Capacity, comfort, and performance are expected to ensure the attractiveness, efficiency and productivity of the system. When operated in double units, the trains can accommodate 600 passengers. They will be interoperable with the existing light metro system and therefore contribute to its the renovation.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"A modernized customer relationship","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">A modernized customer relationship<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">A modernized customer relationship<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">A modernized customer relationship<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The project relies on recent technologies to manage sales, passenger information and security through video surveillance. Several sales systems are planned to allow access for all to the transport system. There will be station sales terminals, rechargeable cards, or the Transtu app via mobile phones. The trainsets are equipped with validation terminals which are compatible with all the systems mentioned above. Equipment such as static line plans, screens and speakers, integrated in stations and in trains, will keep passengers informed throughout their journey. Information will also be available by digital means through the Transtu application or social networks. Finally, CCTV cameras fitted to the stations and trainsets will assist security teams in deterring anti-social behavior or responding faster to incidents.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The project relies on recent technologies to manage sales, passenger information and security through video surveillance. Several sales systems are planned to allow access for all to the transport system. There will be station sales terminals, rechargeable cards, or the Transtu app via mobile phones. The trainsets are equipped with validation terminals which are compatible with all the systems mentioned above. Equipment such as static line plans, screens and speakers, integrated in stations and in trains, will keep passengers informed throughout their journey. Information will also be available by digital means through the Transtu application or social networks. Finally, CCTV cameras fitted to the stations and trainsets will assist security teams in deterring anti-social behavior or responding faster to incidents.<\/p>\n","innerContent":["\n<p>The project relies on recent technologies to manage sales, passenger information and security through video surveillance. Several sales systems are planned to allow access for all to the transport system. There will be station sales terminals, rechargeable cards, or the Transtu app via mobile phones. The trainsets are equipped with validation terminals which are compatible with all the systems mentioned above. Equipment such as static line plans, screens and speakers, integrated in stations and in trains, will keep passengers informed throughout their journey. Information will also be available by digital means through the Transtu application or social networks. Finally, CCTV cameras fitted to the stations and trainsets will assist security teams in deterring anti-social behavior or responding faster to incidents.<\/p>\n"],"rendered":"\n<p>The project relies on recent technologies to manage sales, passenger information and security through video surveillance. Several sales systems are planned to allow access for all to the transport system. There will be station sales terminals, rechargeable cards, or the Transtu app via mobile phones. The trainsets are equipped with validation terminals which are compatible with all the systems mentioned above. Equipment such as static line plans, screens and speakers, integrated in stations and in trains, will keep passengers informed throughout their journey. Information will also be available by digital means through the Transtu application or social networks. Finally, CCTV cameras fitted to the stations and trainsets will assist security teams in deterring anti-social behavior or responding faster to incidents.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Operation","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Operation<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Operation<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Operation<\/h2>\n"},{"blockName":"core\/image","attrs":{"id":5553,"width":"628px","height":"205px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7-1024x334.png","alt":"","caption":"Schematic diagram of Line 2 with its extension \u00a9 Ad\u00e8le Darde, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7-1024x334.png\" alt=\"\" class=\"wp-image-5553\" style=\"width:628px;height:205px\"\/><figcaption class=\"wp-element-caption\">Schematic diagram of Line 2 with its extension \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7-1024x334.png\" alt=\"\" class=\"wp-image-5553\" style=\"width:628px;height:205px\"\/><figcaption class=\"wp-element-caption\">Schematic diagram of Line 2 with its extension \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure7-1024x334.png\" alt=\"\" class=\"wp-image-5553\" style=\"width:628px;height:205px\"\/><figcaption class=\"wp-element-caption\">Schematic diagram of Line 2 with its extension \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Operational conditions are designed to match transport demand. Headway during peak hours is determined based on the capacity of a train of 606 passengers and the target PPHPD. That leads to a headway of 3 minutes on the central section and of 6 minutes on each branch. Journey times are simulated based on the characteristics of the rolling stock and the interstation distances; journey time from end to end is around 30 minutes, which is faster than by car (50 minutes).","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Operational conditions are designed to match transport demand. Headway during peak hours is determined based on the capacity of a train of 606 passengers and the target PPHPD. That leads to a headway of 3 minutes on the central section and of 6 minutes on each branch. Journey times are simulated based on the characteristics of the rolling stock and the interstation distances; journey time from end to end is around 30 minutes, which is faster than by car (50 minutes).<\/p>\n","innerContent":["\n<p>Operational conditions are designed to match transport demand. Headway during peak hours is determined based on the capacity of a train of 606 passengers and the target PPHPD. That leads to a headway of 3 minutes on the central section and of 6 minutes on each branch. Journey times are simulated based on the characteristics of the rolling stock and the interstation distances; journey time from end to end is around 30 minutes, which is faster than by car (50 minutes).<\/p>\n"],"rendered":"\n<p>Operational conditions are designed to match transport demand. Headway during peak hours is determined based on the capacity of a train of 606 passengers and the target PPHPD. That leads to a headway of 3 minutes on the central section and of 6 minutes on each branch. Journey times are simulated based on the characteristics of the rolling stock and the interstation distances; journey time from end to end is around 30 minutes, which is faster than by car (50 minutes).<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The presence of a fork on the extended line induces operational complexities. To address them, a global analysis simulating peak-hour traffic was performed. The simulation identified the critical sections and bottleneck on the itinerary. In particular: the central section where the headway is minimal (3 minutes), the fork at La Jeunesse station where trains from Ennasr and Ariana converge, turnback management at the Place de la R\u00e9publique terminus where the flow is the highest, and finally turnback management at the Ennasr terminus with limited siding positions. In conclusion, the timetable is robust and stable, and can be replicated during the day.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The presence of a fork on the extended line induces operational complexities. To address them, a global analysis simulating peak-hour traffic was performed. The simulation identified the critical sections and bottleneck on the itinerary. In particular: the central section where the headway is minimal (3 minutes), the fork at La Jeunesse station where trains from Ennasr and Ariana converge, turnback management at the Place de la R\u00e9publique terminus where the flow is the highest, and finally turnback management at the Ennasr terminus with limited siding positions. In conclusion, the timetable is robust and stable, and can be replicated during the day.<\/p>\n","innerContent":["\n<p>The presence of a fork on the extended line induces operational complexities. To address them, a global analysis simulating peak-hour traffic was performed. The simulation identified the critical sections and bottleneck on the itinerary. In particular: the central section where the headway is minimal (3 minutes), the fork at La Jeunesse station where trains from Ennasr and Ariana converge, turnback management at the Place de la R\u00e9publique terminus where the flow is the highest, and finally turnback management at the Ennasr terminus with limited siding positions. In conclusion, the timetable is robust and stable, and can be replicated during the day.<\/p>\n"],"rendered":"\n<p>The presence of a fork on the extended line induces operational complexities. To address them, a global analysis simulating peak-hour traffic was performed. The simulation identified the critical sections and bottleneck on the itinerary. In particular: the central section where the headway is minimal (3 minutes), the fork at La Jeunesse station where trains from Ennasr and Ariana converge, turnback management at the Place de la R\u00e9publique terminus where the flow is the highest, and finally turnback management at the Ennasr terminus with limited siding positions. In conclusion, the timetable is robust and stable, and can be replicated during the day.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5555,"width":"452px","height":"408px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8-1024x925.png","alt":"","caption":"Critical sections on the train diagram during peak hour \u00a9 Marine Ferrero, 2023 (source: OpenTrack).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8-1024x925.png\" alt=\"\" class=\"wp-image-5555\" style=\"width:452px;height:408px\"\/><figcaption class=\"wp-element-caption\">Critical sections on the train diagram during peak hour \u00a9 Marine Ferrero, 2023 (source: OpenTrack).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8-1024x925.png\" alt=\"\" class=\"wp-image-5555\" style=\"width:452px;height:408px\"\/><figcaption class=\"wp-element-caption\">Critical sections on the train diagram during peak hour \u00a9 Marine Ferrero, 2023 (source: OpenTrack).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure8-1024x925.png\" alt=\"\" class=\"wp-image-5555\" style=\"width:452px;height:408px\"\/><figcaption class=\"wp-element-caption\">Critical sections on the train diagram during peak hour \u00a9 Marine Ferrero, 2023 (source: OpenTrack).<\/figcaption><\/figure>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Maintenance","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Maintenance<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Maintenance<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Maintenance<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Maintenance of rolling stock and infrastructures will be handled by the existing maintenance and storage facility in Ariana. As part of the extension project, this site must be upgraded and modernized to improve working conditions and enhance all maintenance activities. Ideally located with its connection to the current terminus of Line 2, the site also has empty land in the South, where a training center will be built.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Maintenance of rolling stock and infrastructures will be handled by the existing maintenance and storage facility in Ariana. As part of the extension project, this site must be upgraded and modernized to improve working conditions and enhance all maintenance activities. Ideally located with its connection to the current terminus of Line 2, the site also has empty land in the South, where a training center will be built.<\/p>\n","innerContent":["\n<p>Maintenance of rolling stock and infrastructures will be handled by the existing maintenance and storage facility in Ariana. As part of the extension project, this site must be upgraded and modernized to improve working conditions and enhance all maintenance activities. Ideally located with its connection to the current terminus of Line 2, the site also has empty land in the South, where a training center will be built.<\/p>\n"],"rendered":"\n<p>Maintenance of rolling stock and infrastructures will be handled by the existing maintenance and storage facility in Ariana. As part of the extension project, this site must be upgraded and modernized to improve working conditions and enhance all maintenance activities. Ideally located with its connection to the current terminus of Line 2, the site also has empty land in the South, where a training center will be built.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5557,"width":"499px","height":"713px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9-717x1024.png","alt":"","caption":"Maintenance and storage facility in Ariana \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9-717x1024.png\" alt=\"\" class=\"wp-image-5557\" style=\"width:499px;height:713px\"\/><figcaption class=\"wp-element-caption\">Maintenance and storage facility in Ariana \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9-717x1024.png\" alt=\"\" class=\"wp-image-5557\" style=\"width:499px;height:713px\"\/><figcaption class=\"wp-element-caption\">Maintenance and storage facility in Ariana \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure9-717x1024.png\" alt=\"\" class=\"wp-image-5557\" style=\"width:499px;height:713px\"\/><figcaption class=\"wp-element-caption\">Maintenance and storage facility in Ariana \u00a9 Ad\u00e8le Darde, Fran\u00e7ois Phelippeau, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Conditions required to implement this project","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conditions required to implement this project<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conditions required to implement this project<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conditions required to implement this project<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"To ensure the project\u2019s successful integration and functionality within the Greater Tunis light metro network, it requires the establishment of","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>To ensure the project\u2019s successful integration and functionality within the Greater Tunis light metro network, it requires the establishment of<\/p>\n","innerContent":["\n<p>To ensure the project\u2019s successful integration and functionality within the Greater Tunis light metro network, it requires the establishment of<\/p>\n"],"rendered":"\n<p>To ensure the project\u2019s successful integration and functionality within the Greater Tunis light metro network, it requires the establishment of<\/p>\n"},{"blockName":"core\/list","attrs":{"ordered":false,"values":"\n\n","type":"","start":0,"reversed":false,"placeholder":"","lock":[],"metadata":[],"className":"wp-block-list","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"A single local transport authority: an RAOLT (Regional Authority Organizing Land Transport) would oversee and coordinate public transport services, including contributions from various local entities and private employers,","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>A single local transport authority: an RAOLT (Regional Authority Organizing Land Transport) would oversee and coordinate public transport services, including contributions from various local entities and private employers,<\/li>\n","innerContent":["\n<li>A single local transport authority: an RAOLT (Regional Authority Organizing Land Transport) would oversee and coordinate public transport services, including contributions from various local entities and private employers,<\/li>\n"],"rendered":"\n<li>A single local transport authority: an RAOLT (Regional Authority Organizing Land Transport) would oversee and coordinate public transport services, including contributions from various local entities and private employers,<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Operations and maintenance skills.","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Operations and maintenance skills.<\/li>\n","innerContent":["\n<li>Operations and maintenance skills.<\/li>\n"],"rendered":"\n<li>Operations and maintenance skills.<\/li>\n"}],"innerHTML":"\n<ul class=\"wp-block-list\">\n\n<\/ul>\n","innerContent":["\n<ul class=\"wp-block-list\">",null,"\n\n",null,"<\/ul>\n"],"rendered":"\n<ul class=\"wp-block-list\">\n<li>A single local transport authority: an RAOLT (Regional Authority Organizing Land Transport) would oversee and coordinate public transport services, including contributions from various local entities and private employers,<\/li>\n\n\n\n<li>Operations and maintenance skills.<\/li>\n<\/ul>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Regarding the existing legal and institutional frameworks, we recommend the DBFM Design Build Finance and Maintenance model (PPP structure), leaving operations to the existing operator and including the financing, construction and maintenance of the system. This model requires a concession contract with the existing operator to guarantee service quality and regulation standards.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Regarding the existing legal and institutional frameworks, we recommend the DBFM Design Build Finance and Maintenance model (PPP structure), leaving operations to the existing operator and including the financing, construction and maintenance of the system. This model requires a concession contract with the existing operator to guarantee service quality and regulation standards.<\/p>\n","innerContent":["\n<p>Regarding the existing legal and institutional frameworks, we recommend the DBFM Design Build Finance and Maintenance model (PPP structure), leaving operations to the existing operator and including the financing, construction and maintenance of the system. This model requires a concession contract with the existing operator to guarantee service quality and regulation standards.<\/p>\n"],"rendered":"\n<p>Regarding the existing legal and institutional frameworks, we recommend the DBFM Design Build Finance and Maintenance model (PPP structure), leaving operations to the existing operator and including the financing, construction and maintenance of the system. This model requires a concession contract with the existing operator to guarantee service quality and regulation standards.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"By implementing these recommendations, the project will improve the reliability of the light rail system, ultimately enhancing the overall public transportation network.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>By implementing these recommendations, the project will improve the reliability of the light rail system, ultimately enhancing the overall public transportation network.<\/p>\n","innerContent":["\n<p>By implementing these recommendations, the project will improve the reliability of the light rail system, ultimately enhancing the overall public transportation network.<\/p>\n"],"rendered":"\n<p>By implementing these recommendations, the project will improve the reliability of the light rail system, ultimately enhancing the overall public transportation network.<\/p>\n"},{"blockName":"core\/gallery","attrs":{"linkTo":"none","images":[],"ids":[],"shortCodeTransforms":[],"columns":0,"caption":"","imageCrop":true,"randomOrder":false,"fixedHeight":true,"linkTarget":"","sizeSlug":"large","allowResize":false,"aspectRatio":"auto","lock":[],"metadata":[],"align":"","className":"wp-block-gallery has-nested-images columns-default is-cropped","style":"","backgroundColor":"","gradient":"","borderColor":"","layout":[],"anchor":""},"innerBlocks":[{"blockName":"core\/image","attrs":{"id":5563,"sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-1024x593.jpg","alt":"","caption":"Selection of the contractual model \u00a9 Ad\u00e8le Darde, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","width":"","height":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-1024x593.jpg\" alt=\"\" class=\"wp-image-5563\"\/><figcaption class=\"wp-element-caption\">Selection of the contractual model \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-1024x593.jpg\" alt=\"\" class=\"wp-image-5563\"\/><figcaption class=\"wp-element-caption\">Selection of the contractual model \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-1024x593.jpg\" alt=\"\" class=\"wp-image-5563\"\/><figcaption class=\"wp-element-caption\">Selection of the contractual model \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/image","attrs":{"id":5562,"sizeSlug":"large","linkDestination":"none","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-1024x496.jpg","alt":"","caption":"Contractual structure of the Ennasr project \u00a9 Ad\u00e8le Darde, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","width":"","height":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"align":"","className":"wp-block-image size-large","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-1024x496.jpg\" alt=\"\" class=\"wp-image-5562\"\/><figcaption class=\"wp-element-caption\">Contractual structure of the Ennasr project <em>\u00a9 Ad\u00e8le Darde, 2023.<\/em><\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-1024x496.jpg\" alt=\"\" class=\"wp-image-5562\"\/><figcaption class=\"wp-element-caption\">Contractual structure of the Ennasr project <em>\u00a9 Ad\u00e8le Darde, 2023.<\/em><\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-1024x496.jpg\" alt=\"\" class=\"wp-image-5562\"\/><figcaption class=\"wp-element-caption\">Contractual structure of the Ennasr project <em>\u00a9 Ad\u00e8le Darde, 2023.<\/em><\/figcaption><\/figure>\n"}],"innerHTML":"\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped\">\n\n<\/figure>\n","innerContent":["\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped\">",null,"\n\n",null,"<\/figure>\n"],"rendered":"\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image aligncenter size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure10-1-1024x593.jpg\" alt=\"\" class=\"wp-image-5563\"\/><figcaption class=\"wp-element-caption\">Selection of the contractual model \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure11-1024x496.jpg\" alt=\"\" class=\"wp-image-5562\"\/><figcaption class=\"wp-element-caption\">Contractual structure of the Ennasr project <em>\u00a9 Ad\u00e8le Darde, 2023.<\/em><\/figcaption><\/figure>\n<\/figure>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Economic and financial feasibility","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Economic and financial feasibility<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Economic and financial feasibility<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Economic and financial feasibility<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"During the 30-year contract with the Project Company, annual ridership will stabilize at 29.7M around year four. This project will require an initial investment of \u20ac176.95M.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>During the 30-year contract with the Project Company, annual ridership will stabilize at 29.7M around year four. This project will require an initial investment of \u20ac176.95M.<\/p>\n","innerContent":["\n<p>During the 30-year contract with the Project Company, annual ridership will stabilize at 29.7M around year four. This project will require an initial investment of \u20ac176.95M.<\/p>\n"],"rendered":"\n<p>During the 30-year contract with the Project Company, annual ridership will stabilize at 29.7M around year four. This project will require an initial investment of \u20ac176.95M.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5565,"width":"446px","height":"236px","sizeSlug":"full","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure12.png","alt":"","caption":"Estimated initial investment of the light metro extension project \u00a9 Ad\u00e8le Darde, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-full is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure12.png\" alt=\"\" class=\"wp-image-5565\" style=\"width:446px;height:236px\"\/><figcaption class=\"wp-element-caption\">Estimated initial investment of the light metro extension project \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure12.png\" alt=\"\" class=\"wp-image-5565\" style=\"width:446px;height:236px\"\/><figcaption class=\"wp-element-caption\">Estimated initial investment of the light metro extension project \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_figure12.png\" alt=\"\" class=\"wp-image-5565\" style=\"width:446px;height:236px\"\/><figcaption class=\"wp-element-caption\">Estimated initial investment of the light metro extension project \u00a9 Ad\u00e8le Darde, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"To incentivize use of this mode of transportation, three types of tickets are proposed (single ride, monthly, annual and school subscriptions) with a 50% reduction for school and social fares. Additionally, the stations offer opportunities for advertising revenue and commercial space utilization.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>To incentivize use of this mode of transportation, three types of tickets are proposed (single ride, monthly, annual and school subscriptions) with a 50% reduction for school and social fares. Additionally, the stations offer opportunities for advertising revenue and commercial space utilization.<\/p>\n","innerContent":["\n<p>To incentivize use of this mode of transportation, three types of tickets are proposed (single ride, monthly, annual and school subscriptions) with a 50% reduction for school and social fares. Additionally, the stations offer opportunities for advertising revenue and commercial space utilization.<\/p>\n"],"rendered":"\n<p>To incentivize use of this mode of transportation, three types of tickets are proposed (single ride, monthly, annual and school subscriptions) with a 50% reduction for school and social fares. Additionally, the stations offer opportunities for advertising revenue and commercial space utilization.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Total annual operating revenue amounts to \u20ac3.147M. The cost structure comprises personnel expenses, as well as costs associated with maintenance of the trains and infrastructure. Importantly, the evaluation incorporates the cost difference to reflect Tunisian conditions accurately. The annual costs are estimated at \u20ac10.1M for an annual distance travelled of 1,744,797km.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Total annual operating revenue amounts to \u20ac3.147M. The cost structure comprises personnel expenses, as well as costs associated with maintenance of the trains and infrastructure. Importantly, the evaluation incorporates the cost difference to reflect Tunisian conditions accurately. The annual costs are estimated at \u20ac10.1M for an annual distance travelled of 1,744,797km.<\/p>\n","innerContent":["\n<p>Total annual operating revenue amounts to \u20ac3.147M. The cost structure comprises personnel expenses, as well as costs associated with maintenance of the trains and infrastructure. Importantly, the evaluation incorporates the cost difference to reflect Tunisian conditions accurately. The annual costs are estimated at \u20ac10.1M for an annual distance travelled of 1,744,797km.<\/p>\n"],"rendered":"\n<p>Total annual operating revenue amounts to \u20ac3.147M. The cost structure comprises personnel expenses, as well as costs associated with maintenance of the trains and infrastructure. Importantly, the evaluation incorporates the cost difference to reflect Tunisian conditions accurately. The annual costs are estimated at \u20ac10.1M for an annual distance travelled of 1,744,797km.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Considering depreciation of the initial investment (\u20ac9.03M), revenues cover 31% of the operating and maintenance costs. The balancing subsidy encompasses government compensations, financial charges, and taxes, amounting to \u20ac16.585M per year (based on the fourth year).","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Considering depreciation of the initial investment (\u20ac9.03M), revenues cover 31% of the operating and maintenance costs. The balancing subsidy encompasses government compensations, financial charges, and taxes, amounting to \u20ac16.585M per year (based on the fourth year).<\/p>\n","innerContent":["\n<p>Considering depreciation of the initial investment (\u20ac9.03M), revenues cover 31% of the operating and maintenance costs. The balancing subsidy encompasses government compensations, financial charges, and taxes, amounting to \u20ac16.585M per year (based on the fourth year).<\/p>\n"],"rendered":"\n<p>Considering depreciation of the initial investment (\u20ac9.03M), revenues cover 31% of the operating and maintenance costs. The balancing subsidy encompasses government compensations, financial charges, and taxes, amounting to \u20ac16.585M per year (based on the fourth year).<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Planning and timeline","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Planning and timeline<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Planning and timeline<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Planning and timeline<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The creation of an institutional and regulatory coordination body for urban transport in Tunis is a crucial first step to ensure the smooth operation of the network. It will be responsible for coordinating transport intermodality in Greater Tunis and for steering the network\u2019s economic and financial performance.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The creation of an institutional and regulatory coordination body for urban transport in Tunis is a crucial first step to ensure the smooth operation of the network. It will be responsible for coordinating transport intermodality in Greater Tunis and for steering the network\u2019s economic and financial performance.<\/p>\n","innerContent":["\n<p>The creation of an institutional and regulatory coordination body for urban transport in Tunis is a crucial first step to ensure the smooth operation of the network. It will be responsible for coordinating transport intermodality in Greater Tunis and for steering the network\u2019s economic and financial performance.<\/p>\n"],"rendered":"\n<p>The creation of an institutional and regulatory coordination body for urban transport in Tunis is a crucial first step to ensure the smooth operation of the network. It will be responsible for coordinating transport intermodality in Greater Tunis and for steering the network\u2019s economic and financial performance.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Preliminary work and earthworks will be carried out to prepare the space required for the infrastructure, which may include archaeological excavations.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Preliminary work and earthworks will be carried out to prepare the space required for the infrastructure, which may include archaeological excavations.<\/p>\n","innerContent":["\n<p>Preliminary work and earthworks will be carried out to prepare the space required for the infrastructure, which may include archaeological excavations.<\/p>\n"],"rendered":"\n<p>Preliminary work and earthworks will be carried out to prepare the space required for the infrastructure, which may include archaeological excavations.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Construction of the engineering structures will follow, while taking care to maintain traffic on the main route of the X2. The drainage and roadway development operations will then be started, with the installation of footbridges to ensure the safety of passengers in relation to road traffic, particularly at the new stations.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Construction of the engineering structures will follow, while taking care to maintain traffic on the main route of the X2. The drainage and roadway development operations will then be started, with the installation of footbridges to ensure the safety of passengers in relation to road traffic, particularly at the new stations.<\/p>\n","innerContent":["\n<p>Construction of the engineering structures will follow, while taking care to maintain traffic on the main route of the X2. The drainage and roadway development operations will then be started, with the installation of footbridges to ensure the safety of passengers in relation to road traffic, particularly at the new stations.<\/p>\n"],"rendered":"\n<p>Construction of the engineering structures will follow, while taking care to maintain traffic on the main route of the X2. The drainage and roadway development operations will then be started, with the installation of footbridges to ensure the safety of passengers in relation to road traffic, particularly at the new stations.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The choice of rolling stock is crucial and must be made at the beginning of the project to anticipate possible delays. The necessary training for drivers and maintainers will start at the beginning of the project and will be carried out on the section already in operation between Barcelona and La Medina, allowing the equipment to be brought up to standard and the technicians to be trained in maintenance.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The choice of rolling stock is crucial and must be made at the beginning of the project to anticipate possible delays. The necessary training for drivers and maintainers will start at the beginning of the project and will be carried out on the section already in operation between Barcelona and La Medina, allowing the equipment to be brought up to standard and the technicians to be trained in maintenance.<\/p>\n","innerContent":["\n<p>The choice of rolling stock is crucial and must be made at the beginning of the project to anticipate possible delays. The necessary training for drivers and maintainers will start at the beginning of the project and will be carried out on the section already in operation between Barcelona and La Medina, allowing the equipment to be brought up to standard and the technicians to be trained in maintenance.<\/p>\n"],"rendered":"\n<p>The choice of rolling stock is crucial and must be made at the beginning of the project to anticipate possible delays. The necessary training for drivers and maintainers will start at the beginning of the project and will be carried out on the section already in operation between Barcelona and La Medina, allowing the equipment to be brought up to standard and the technicians to be trained in maintenance.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The recruitment and training of personnel, such as drivers, maintainers and operators, should begin 3 years before the new line is commissioned.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The recruitment and training of personnel, such as drivers, maintainers and operators, should begin 3 years before the new line is commissioned.<\/p>\n","innerContent":["\n<p>The recruitment and training of personnel, such as drivers, maintainers and operators, should begin 3 years before the new line is commissioned.<\/p>\n"],"rendered":"\n<p>The recruitment and training of personnel, such as drivers, maintainers and operators, should begin 3 years before the new line is commissioned.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Conclusion","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conclusion<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conclusion<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conclusion<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"This project provides a response to the need for increased mobility between the suburbs and city center, with a public transport solution adapted to growing demand. Financed through a public-private partnership (PPP), this regional project will revitalize the Tunis public transport system. Together with the R\u00e9seau Ferroviaire Rapide (RFR), the extension will improve the capital\u2019s connectivity and enhance its transport network.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>This project provides a response to the need for increased mobility between the suburbs and city center, with a public transport solution adapted to growing demand. Financed through a public-private partnership (PPP), this regional project will revitalize the Tunis public transport system. Together with the R\u00e9seau Ferroviaire Rapide (RFR), the extension will improve the capital\u2019s connectivity and enhance its transport network.<\/p>\n","innerContent":["\n<p>This project provides a response to the need for increased mobility between the suburbs and city center, with a public transport solution adapted to growing demand. Financed through a public-private partnership (PPP), this regional project will revitalize the Tunis public transport system. Together with the R\u00e9seau Ferroviaire Rapide (RFR), the extension will improve the capital\u2019s connectivity and enhance its transport network.<\/p>\n"],"rendered":"\n<p>This project provides a response to the need for increased mobility between the suburbs and city center, with a public transport solution adapted to growing demand. Financed through a public-private partnership (PPP), this regional project will revitalize the Tunis public transport system. Together with the R\u00e9seau Ferroviaire Rapide (RFR), the extension will improve the capital\u2019s connectivity and enhance its transport network.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Development of Line 2 will contribute to upgrading neglected areas exposed to automobile pollution. The extension towards Ennasr will serve 50,000 additional inhabitants, considerably improving travel in the North and Northwest of Tunis, as well as in neighboring municipalities. It will facilitate the conversion and development of areas undergoing change, thereby boosting attractiveness and development.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Development of Line 2 will contribute to upgrading neglected areas exposed to automobile pollution. The extension towards Ennasr will serve 50,000 additional inhabitants, considerably improving travel in the North and Northwest of Tunis, as well as in neighboring municipalities. It will facilitate the conversion and development of areas undergoing change, thereby boosting attractiveness and development.<\/p>\n","innerContent":["\n<p>Development of Line 2 will contribute to upgrading neglected areas exposed to automobile pollution. The extension towards Ennasr will serve 50,000 additional inhabitants, considerably improving travel in the North and Northwest of Tunis, as well as in neighboring municipalities. It will facilitate the conversion and development of areas undergoing change, thereby boosting attractiveness and development.<\/p>\n"],"rendered":"\n<p>Development of Line 2 will contribute to upgrading neglected areas exposed to automobile pollution. The extension towards Ennasr will serve 50,000 additional inhabitants, considerably improving travel in the North and Northwest of Tunis, as well as in neighboring municipalities. It will facilitate the conversion and development of areas undergoing change, thereby boosting attractiveness and development.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"However, the viability of the project is threatened by the current economic crisis in Tunisia, putting the country on the verge of default. Its high level of debt makes it difficult to obtain international financing unless there is positive political action in response to the IMF proposal. Political and economic measures will be needed to ensure the successful completion of the project and contribute to the country\u2019s economic recovery.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>However, the viability of the project is threatened by the current economic crisis in Tunisia, putting the country on the verge of default. Its high level of debt makes it difficult to obtain international financing unless there is positive political action in response to the IMF proposal. Political and economic measures will be needed to ensure the successful completion of the project and contribute to the country\u2019s economic recovery.<\/p>\n","innerContent":["\n<p>However, the viability of the project is threatened by the current economic crisis in Tunisia, putting the country on the verge of default. Its high level of debt makes it difficult to obtain international financing unless there is positive political action in response to the IMF proposal. Political and economic measures will be needed to ensure the successful completion of the project and contribute to the country\u2019s economic recovery.<\/p>\n"],"rendered":"\n<p>However, the viability of the project is threatened by the current economic crisis in Tunisia, putting the country on the verge of default. Its high level of debt makes it difficult to obtain international financing unless there is positive political action in response to the IMF proposal. Political and economic measures will be needed to ensure the successful completion of the project and contribute to the country\u2019s economic recovery.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><\/p>\n","innerContent":["\n<p><\/p>\n"],"rendered":"\n<p><\/p>\n"}],"seo":{"title":"Extension of light metro tram Line 2 line towards Ennasr (Tunisia)"},"media":{"img":"<img width=\"1917\" height=\"2560\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-scaled.jpg\" class=\"attachment-full size-full\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-scaled.jpg 1917w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-225x300.jpg 225w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-767x1024.jpg 767w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-768x1025.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-1920x2563.jpg 1920w\" sizes=\"auto, (max-width: 1917px) 100vw, 1917px\" \/>","src":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Ennasr_couv-scaled.jpg"},"url":"\/en\/articles\/extension-of-light-metro-tram-line-2-line-towards-ennasr-tunisia\/","related":{"post":[],"author":[],"subject":[{"title":"Cities, Urban planning &#038; Construction","url":"\/en\/subjects\/cities-urban-planning-construction\/","id":"936","media":"<img width=\"1920\" height=\"1080\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville.jpg\" class=\"attachment- size- wp-post-image\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville.jpg 1920w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville-300x169.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville-1024x576.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville-768x432.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>","slug":"cities-urban-planning-construction"},{"title":"Mobility, Transport &#038; Infrastructure","url":"\/en\/subjects\/mobility-transport-infrastructure\/","id":"692","media":"<img width=\"1920\" height=\"1080\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites.jpg\" class=\"attachment- size- wp-post-image\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites.jpg 1920w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites-300x169.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites-1024x576.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites-768x432.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>","slug":"mobility-transport-infrastructure"}],"category":[{"title":"On the School benches","url":"\/en\/articles\/category\/sur-les-bancs-de-lecole\/","id":"1721","media":"","slug":"sur-les-bancs-de-lecole","_related_post_type":""}],"folder":[{"title":"Mobility in Africa","url":"\/en\/folders\/mobility-in-africa\/","id":"6454","media":"<img width=\"2560\" height=\"1705\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-scaled.jpg\" class=\"attachment- size- wp-post-image\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-scaled.jpg 2560w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-300x200.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-1024x682.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-768x511.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-1920x1279.jpg 1920w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/>","slug":"mobility-in-africa"}]},"translated":"https:\/\/ingenius.ecoledesponts.fr\/articles\/extension-de-la-ligne-2-du-metro-leger-en-direction-dennasr-tunisie\/","icon":"icon-article","duration":"10","custom_excerpt":"<p class=\"MsoNormal\" style=\"text-align:justify\"><span lang=\"EN-US\" style=\"mso-ansi-language:EN-US\"><\/span><\/p>The population of the Greater Tunis region of the capital of Tunisia is constantly increasing, bringing potential for future economic growth. However, it suffers from a dilapidated public transportation network. In particular, the light rail network, currently managed by Transtu, is poorly operated and maintained. In addition, the political framework in Tunisia is highly complex and continues to give priority to road projects. In this context, we study the project to extend Line 2 to Ennasr, an area not currently connected by light rail, but by bus only. The intention of the project is to provide a solution to the mobility problem in an urban center suffering from traffic congestion. Furthermore, we take the opportunity of this project to bring new life to the system. By modernizing the infrastructure and equipment, we aim to make the urban transport system more attractive so that the inhabitants of Greater Tunis embrace their light rail system<span lang=\"EN-US\" style=\"mso-ansi-language:EN-US\">.<\/span>","duration_type":"","_links":{"self":[{"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/posts\/5979","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/comments?post=5979"}],"version-history":[{"count":5,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/posts\/5979\/revisions"}],"predecessor-version":[{"id":8994,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/posts\/5979\/revisions\/8994"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/media\/5536"}],"wp:attachment":[{"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/media?parent=5979"}],"wp:term":[{"taxonomy":"article-types","embeddable":true,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/article-types?post=5979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}