{"id":5989,"date":"2024-06-19T22:38:55","date_gmt":"2024-06-19T20:38:55","guid":{"rendered":"https:\/\/ingenius.ecoledesponts.fr\/?p=5989"},"modified":"2025-07-29T16:20:45","modified_gmt":"2025-07-29T14:20:45","slug":"extension-of-the-sahel-metro-in-tram-train-mode-in-the-conurbation-of-sousse-tunisia","status":"publish","type":"post","link":"https:\/\/ingenius.ecoledesponts.fr\/en\/articles\/extension-of-the-sahel-metro-in-tram-train-mode-in-the-conurbation-of-sousse-tunisia\/","title":{"rendered":"Extension of the Sahel Metro in tram-train mode in the conurbation of Sousse (Tunisia)"},"content":{"rendered":"\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-1024x768.jpg\" alt=\"\" class=\"wp-image-5571\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-1024x768.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-300x225.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-768x576.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-1920x1440.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">The Medina of Sousse&nbsp;\u00a9 Amal Bourkhis, 2021, Unsplash License (source : Unsplash)<\/figcaption><\/figure>\n\n\n\n<p class=\"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size wp-elements-8263ec540807f75b8d6804f9479939b3\">This project is part of the <strong>Specialized Master\u00ae in Rail and Urban Transport Systems<\/strong> at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.<br><br>The students&#8217; work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.<br><br>An English summary of the work is published each year in the yearbook on the MS website.- Federico Antoniazzi<br><br><strong>Work by : Vincent Bourgeois, Hamza El Behja, Jean-Jacques Kakanou Kili et Mariette Luscan<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Introduction <\/h2>\n\n\n\n<p>The transport system in Sousse, Tunisia has undergone significant changes, but is currently inadequate. This project analyzes the situation, proposes a sustainable and efficient public transport solution, and presents potential scenarios. We assess socio-demographic context, key stakeholders (SNCFT, ANME, AMMU, STS), and existing modes, such as private vehicles, STS services, irregular transport, and walking. Comparing scenarios, we consider environmental impact, integration, societal responsibility, accessibility, infrastructure, rolling stock, and service performance. Our proposed solution describes the tramway extension route, urban integration, technical aspects, and economic, social, and environmental benefits. Our goal is to improve transport, enhance quality of life, and promote sustainability in Sousse.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Diagnosis<\/h2>\n\n\n\n<p>The transportation dynamics of the Sousse conurbation indicate that movements within suburban centers predominantly occur on foot, while trips between suburban centers and between these centers and the city center rely heavily on private cars. For individuals without private vehicles, <a>non-regular transportation <\/a>serves as a relevant alternative.<\/p>\n\n\n\n<p>Our project focuses on travel between the different centers, highlighting the following key flows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Northwest: Kal\u00e2a K\u00e9bira, Akouda, and Sousse.<\/li>\n\n\n\n<li>South\/Southwest: Cit\u00e9 Ezzohour and Sousse, as well as Zawia Sousse and Sousse.<\/li>\n\n\n\n<li>West: Kal\u00e2a Sghira and Sousse.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"724\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-1024x724.png\" alt=\"\" class=\"wp-image-5573\" style=\"width:564px;height:399px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-1024x724.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-300x212.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-768x543.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-1920x1357.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Main flows for current transport modes in the Sousse conurbation \u00a9 Hamza El Behja, 2023 (map data: GoogleMaps).<\/figcaption><\/figure>\n\n\n\n<p>Sousse boasts a dynamic economy driving an anticipated rise in transportation demand. Trip-generating areas are located around the city center, providing a favorable environment for establishing an efficient public transportation system. However, challenges do remain. The convergence of commuting towards the historic center underscores the insufficient public transportation network across the conurbation. The struggling SNCFT faces limitations in executing large-scale projects.<\/p>\n\n\n\n<p>Opportunities are arising with the recently-established mobility organizing authority, promising improved mobility policies. The presence of underutilized rail networks and stations presents possibilities for revitalization.<\/p>\n\n\n\n<p>Nevertheless, potential threats include political instability affecting decision-making, and defining employment arrangements for the employees of the new operators.<\/p>\n\n\n\n<p>To solve these issues, we must design a transportation system that caters directly to the major trip-generating centers, ensuring an attractive service that encourages a shift towards rail transportation. Establishing a structuring axis within the conurbation facilitates intermodal hubs and overcomes SNCFT limitations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Scenario<\/h2>\n\n\n\n<p>This project proposes to extend the Sahel Metro with a new tram line from Sousse Bab Jedid to Sousse Ville, Akouda, and Kal\u00e2a K\u00e9bira. The tram-train system integrates the urban and railway segments, covering a total distance of 87km. By using electric power, it reduces road pollution significantly. The route follows existing roads, optimizing space but requiring traffic flow reorganization during construction.<\/p>\n\n\n\n<p>This scenario serves the growing Sousse conurbation, connecting the northern suburbs and key population centers. It enables the creation of multiple tramway stops, improving local accessibility. Intermodal hubs can be established in Sousse, Akouda, and Kal\u00e2a K\u00e9bira facilitating seamless transfers between modes.<\/p>\n\n\n\n<p>Infrastructure-wise, it utilizes the existing Sahel Metro infrastructure for railways and constructs new tracks for the urban section. Tram signaling employs the STBS technology, while the railway section retains the automatic block system. The required tram-train rolling stock operates on 750V for urban areas and 25kV for railways, and is readily available.<\/p>\n\n\n\n<p>Based on a multicriteria analysis, this project outperformed other scenarios. It extends the Sahel Metro as a tram-train system, fulfilling the project\u2019s objectives. Concerns about available rolling stock have been resolved. The scenario meets transportation needs, promoting sustainable modal shifts.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"732\" height=\"1024\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2-732x1024.png\" alt=\"\" class=\"wp-image-5575\" style=\"width:400px;height:560px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2-732x1024.png 732w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2-214x300.png 214w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2-768x1075.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2.png 1781w\" sizes=\"auto, (max-width: 732px) 100vw, 732px\" \/><figcaption class=\"wp-element-caption\">Map of the chosen scenario \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).<\/figcaption><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Route and stations<\/h2>\n\n\n\n<p>The track runs for a total length of 84km, as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>An urban zone: from Kalaa Kebira to Sousse Bab Jedid.<\/li>\n\n\n\n<li>A railway zone: from Sousse Bab Jedid to Mahdia.<\/li>\n<\/ul>\n\n\n\n<p>The railway part of the route follows the current Sahel Metro route. The urban part of the route, the extension itself, needs to be determined.<\/p>\n\n\n\n<p>The route of the urban part was designed to follow engineering rules, to limit the impact on land by using existing roads, to facilitate the urban integration of the new transport system, and to allow the creation of intermodal hubs.<\/p>\n\n\n\n<p>The chosen route for the tram-train extension is composed of 5 different sections shown on the following diagram:<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"564\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-1024x564.png\" alt=\"\" class=\"wp-image-5577\" style=\"width:532px;height:293px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-1024x564.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-300x165.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-768x423.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-1920x1057.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Chosen route \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).<\/figcaption><\/figure>\n\n\n\n<p>The new 14km of urban line enables the creation of 27 new stations (interstation of 500m on average). Their location allows connections with the existing transport network.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Traffic study<\/h2>\n\n\n\n<p>The traffic analysis includes both external and internal flows.<\/p>\n\n\n\n<p>For the external flows, the Sahel Metro contributes 16,200 passengers per day to the urban section of the tram-train.<\/p>\n\n\n\n<p>Regarding the internal flows, two calculation methods were employed. The first method was based on modal shift and mode choice, and the second method considers the tram-train\u2019s attraction area and modal share. After evaluating the results from both methods, the average internal flow was determined to be 34,771 passengers per day.<\/p>\n\n\n\n<p>The total flow, combining the external and internal flows, amounts to 50,971 passengers per day. Based on this analysis, the calculated PPHPD for the Sahel Metro project is 4,720 passengers per hour per direction.<\/p>\n\n\n\n<p>This finding confirms the relevance and viability of implementing the tram-train system in Sousse, as the PPHPD falls within the expected range for tramway projects.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Operation<\/h2>\n\n\n\n<p>Managing tram-train operations is challenging due to the mix of urban and interurban environments. The current Sahel Metro will be replaced by a tram-train service. Advantages include exclusive infrastructure for tram-trains and improved service quality. Disadvantages include complications for SNCFT and the loss of an important market. This option offers a higher-quality transport service and efficient operation.<\/p>\n\n\n\n<p>High-frequency service will be provided during peak and off-peak hours. Frequencies on the railway section will improve the Sousse &#8211; Monastir &#8211; Mahdia corridor compared to the current Sahel Metro.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"250\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-1024x250.png\" alt=\"\" class=\"wp-image-5581\" style=\"width:450px;height:110px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-1024x250.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-300x73.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-768x188.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-1920x469.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Frequency on each section at peak-hours \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n\n\n\n<p>Rolling stock will be optimized and a single omnibus mission type will be offered.<\/p>\n\n\n\n<p>Tram\u2019s commercial speed is 20km\/h with 40-second station stops. The Sahel Metro train\u2019s commercial speed is 52km\/h with 1-minute station stops.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Rolling Stock<\/h2>\n\n\n\n<p>Tram-train rolling stock will be meter-gauge and limited to a 65-meter platform length. A 160m\u00b2 tram-train, 60 meters long, with 340 seats and foldable seats for a capacity of 385, is proposed due to project constraints and passenger demand.<\/p>\n\n\n\n<p>To determine fleet size, peak-hour traffic and frequencies were considered :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Sousse City segment requires 24 trains at a 4-minute frequency<\/li>\n\n\n\n<li>Sousse-Monastir segment needs 4 trains at a 15-minute frequency<\/li>\n\n\n\n<li>Monastir-Mahdia segment requires 4 trains at a 30-minute frequency<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"535\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5-1024x535.jpg\" alt=\"\" class=\"wp-image-5583\" style=\"width:492px;height:257px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5-1024x535.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5-300x157.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5-768x401.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">PPHPD for each section \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n\n\n\n<p>Factoring in layover and turnaround times, an additional 4 trains are needed. In total, 32 tram-trains are necessary for nominal service. Adding 10% for maintenance and 10% as reserve, 38 trains are required. The fleet size and train storage align with the Space-Time Graph.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"512\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6-1024x512.png\" alt=\"\" class=\"wp-image-5585\" style=\"width:452px;height:226px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6-1024x512.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6-300x150.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6-768x384.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6.png 1168w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Space-Time Graph \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Technical choices and infrastructure <\/h2>\n\n\n\n<p>As far as the train section is concerned, the project includes significant enhancements, such as removing 10 level crossings, renovating 20% of deteriorated sections, securing railway areas, and upgrading the Monastir signaling control system to computer-based interlocking. Tram infrastructure focuses on key intersections, using existing road bridges and constructing a new one at Kal\u00e2a K\u00e9bira station. The tramway platform utilizes continuous concrete track with embedded rails and steel fastenings. Drainage includes canals between and alongside the tracks.<\/p>\n\n\n\n<p>The signaling system adopts France\u2019s STBS (Transmission System on Board and Ground). Tram signaling employs rectangular lights for stop (red bar) and proceed (white\/green bar). Fixed signs display speed limits. Route control relies on the Interlocking system at Le D\u00e9p\u00f4t station. Road intersections have traffic lights that prioritize trams via preemption signals. A total of 162 signals and 198 beacons will be installed, approximately one every 172m along the tram route.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"625\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-1024x625.png\" alt=\"\" class=\"wp-image-5587\" style=\"width:360px;height:220px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-1024x625.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-300x183.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-768x469.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-1920x1172.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Representation of the in-station signaling \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n\n\n\n<p>Trams in Sousse operate with 750 V DC power. Transformer-rectifier units convert the public network&#8217;s 15 kV AC to DC. Substations are spaced 7 km apart, with two substations covering 7 km each for the 14 km tram line, and an additional substation in the middle for reliability purposes. Voltage drop at line ends is compensated by two parallel connection posts. Energy storage units facilitate regenerative braking and provide backup power. Required equipment includes three substations, two connection posts, and two energy storage units. Substations have a nominal power of 3 MW, supporting 9 MW for 1 minute. Peak hours provide an instantaneous power injection of 4.2 MW.<\/p>\n\n\n\n<p>The Sahel Metro project necessitates four maintenance and storage centers for tram-trains. Centers will be evenly distributed along the line in Sousse, with the main center in Kal\u00e2a K\u00e9bira featuring storage for 15 trains, a 7,000 m\u00b2 building for heavy maintenance, and a 4,000 m\u00b2 building for service and washing. The second center, between Sousse Sud and Sousse Zone Industrielle, offers storage for 18 trains and a 4,000 m\u00b2 maintenance building. Monastir and Mahdia will have storage depots for 3 and 2 tram-trains, respectively, without maintenance facilities.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-1024x577.png\" alt=\"\" class=\"wp-image-5589\" style=\"width:534px;height:301px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-1024x577.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-300x169.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-768x433.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-1920x1083.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Line diagram with the main facilities \u00a9 Vincent Bourgeois, Mariette Luscan, 2023.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Economic and financial feasibility<\/h2>\n\n\n\n<p>The project cost estimation reveals that civil engineering accounts for nearly 50% of the total cost, with a notable share allocated to the railway section for level crossing elimination and track renewal. Electrification represents over 25% of the cost, primarily focused on the urban area. Signaling, telecommunications, studies, rolling stock, and a risk provision contribute to the remaining expenses. The overall investment cost amounts to \u20ac707 million.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"606\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-1024x606.png\" alt=\"\" class=\"wp-image-5591\" style=\"width:448px;height:265px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-1024x606.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-300x177.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-768x454.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-1920x1135.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Breakdown of the total project cost \u00a9 Jean-Jacques Kakanou Kili, 2023.<\/figcaption><\/figure>\n\n\n\n<p>Regarding the operating and financial balance, operating revenues cover production costs, excluding rolling stock depreciation. However, only 19% of the total charges are covered by operating revenues, necessitating annual subsidies exceeding \u20ac35 million to balance the finances.<\/p>\n\n\n\n<p>The socio-economic assessment considers factors such as time savings, cost savings compared to car travel, reductions in CO<sub>2<\/sub> emissions, noise mitigation, and safety improvements. The calculated net present value for the project stands at \u20ac77.2 million, indicating a positive socio-economic impact.<\/p>\n\n\n\n<p>In conclusion, the Sahel tram-train project demonstrates economic and financial feasibility, accompanied by significant socio-economic benefits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Project set-up<\/h2>\n\n\n\n<p>In Tunisia, strategic sectors like energy and transportation are managed by state-owned entities. When planning the Sousse tram-train project, the local context must be considered. Long-term private approaches may not suit institutional and social constraints.<\/p>\n\n\n\n<p>The public sector faces structural issues that have an impact on service quality, and the expertise of experienced private actors is crucial for success. The project\u2019s structure will balance public-private interests. The core is the public-owned STTC (Sahel Tram-Train Company), managing construction and operation. The Tunisian government, Sahel municipalities, and AMMUS are key stakeholders. Technical expertise will be provided through project owner assistance. Construction will be under public project management. Financing relies on contributions and loans. Operation and maintenance will be contracted to a private organization for 10 years, with STTC remunerating the operator.<\/p>\n\n\n\n<p>The project involves a private operator for the entire tram-train line, including Monastir-Mahdia. Legislative separation of infrastructure management and operations is a prerequisite. SNCFT will retain infrastructure management and delegate rolling stock operation to the new operator. Staff and maintenance personnel will be transferred under negotiated conditions.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"851\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-1024x851.png\" alt=\"\" class=\"wp-image-5593\" style=\"width:538px;height:447px\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-1024x851.png 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-300x249.png 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-768x638.png 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-1920x1595.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Project set-up diagram \u00a9 Hamza El Behja, 2023.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conclusion<\/h2>\n\n\n\n<p>To conclude, the proposed Sahel tram-train project offers a sustainable and efficient solution to the transport challenges of Sousse. It is economically viable, with significant socio-economic benefits. Collaboration between public and private stakeholders is essential for successful implementation and improved transport in Sousse.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This project is part of the Specialized Master\u00ae in Rail and Urban Transport Systems at \u00c9cole nationale des ponts et [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":5569,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_related_content_post":[],"_related_content_subject":[936,692],"_related_content_author":[],"_related_content_category":[1721],"_related_content_folder":[6454],"_excerpt":"The project analyzes the Sousse transport system, identifies its limitations, and proposes a sustainable solution. Challenges include inadequate public transport and a heavy reliance on private cars. The chosen scenario extends the Sahel Metro with a tram-train system, covering 87km and improving accessibility. The route follows existing roads and creates intermodal hubs. The analysis estimates a daily flow of 50,971 passengers, confirming the project\u2019s viability. Tram-train operations present challenges but offer higher-quality service. The fleet size of 38 tram-trains is determined, and infrastructure enhancements are planned. The project\u2019s total cost is estimated at \u20ac707 million, with subsidies needed to balance the finances. The socio-economic assessment demonstrates positive impacts. The project will involve a balanced public-private structure, with the public-owned STTC managing construction and operation, and a private operator for the entire tram-train line.<br>","_duration":9,"_manual_duration":false,"footnotes":""},"article-types":[13,27],"class_list":["post-5989","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","article-types-article","article-types-folder"],"has_blocks":true,"block_data":[{"blockName":"enpc\/excerpt","attrs":{"lock":[],"metadata":[],"className":"","style":""},"innerBlocks":[],"innerHTML":"","innerContent":[],"rendered":""},{"blockName":"core\/image","attrs":{"id":5571,"sizeSlug":"large","linkDestination":"none","align":"wide","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-1024x768.jpg","alt":"","caption":"The Medina of Sousse\u00a0\u00a9 Amal Bourkhis, 2021, Unsplash License (source : Unsplash)","lightbox":[],"title":"","href":"","rel":"","linkClass":"","width":"","height":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image alignwide size-large","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image alignwide size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-1024x768.jpg\" alt=\"\" class=\"wp-image-5571\"\/><figcaption class=\"wp-element-caption\">The Medina of Sousse&nbsp;\u00a9 Amal Bourkhis, 2021, Unsplash License (source : Unsplash)<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image alignwide size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-1024x768.jpg\" alt=\"\" class=\"wp-image-5571\"\/><figcaption class=\"wp-element-caption\">The Medina of Sousse&nbsp;\u00a9 Amal Bourkhis, 2021, Unsplash License (source : Unsplash)<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image alignwide size-large\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1-1024x768.jpg\" alt=\"\" class=\"wp-image-5571\"\/><figcaption class=\"wp-element-caption\">The Medina of Sousse&nbsp;\u00a9 Amal Bourkhis, 2021, Unsplash License (source : Unsplash)<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"style":{"elements":{"link":{"color":{"text":"var:preset|color|white"}}}},"backgroundColor":"light-blue","textColor":"white","fontSize":"small","align":"","content":"This project is part of the Specialized Master\u00ae in Rail and Urban Transport Systems at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.The students' work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.An English summary of the work is published each year in the yearbook on the MS website.- Federico AntoniazziWork by : Vincent Bourgeois, Hamza El Behja, Jean-Jacques Kakanou Kili et Mariette Luscan","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size","gradient":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p class=\"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size\">This project is part of the <strong>Specialized Master\u00ae in Rail and Urban Transport Systems<\/strong> at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.<br><br>The students' work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.<br><br>An English summary of the work is published each year in the yearbook on the MS website.- Federico Antoniazzi<br><br><strong>Work by : Vincent Bourgeois, Hamza El Behja, Jean-Jacques Kakanou Kili et Mariette Luscan<\/strong><\/p>\n","innerContent":["\n<p class=\"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size\">This project is part of the <strong>Specialized Master\u00ae in Rail and Urban Transport Systems<\/strong> at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.<br><br>The students' work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.<br><br>An English summary of the work is published each year in the yearbook on the MS website.- Federico Antoniazzi<br><br><strong>Work by : Vincent Bourgeois, Hamza El Behja, Jean-Jacques Kakanou Kili et Mariette Luscan<\/strong><\/p>\n"],"rendered":"\n<p class=\"has-white-color has-light-blue-background-color has-text-color has-background has-link-color has-small-font-size\">This project is part of the <strong>Specialized Master\u00ae in Rail and Urban Transport Systems<\/strong> at \u00c9cole nationale des ponts et chauss\u00e9es, in cooperation with the Universit\u00e9 de Technologie de Compi\u00e8gne (UTC) and INSA Hauts-de-France, under the direction of Federico Antoniazzi.<br><br>The students' work is supervised by a teaching team consisting of Fran\u00e7oise Manderscheid and Antoine Chevre, the latter representing the Agence Fran\u00e7aise de D\u00e9veloppement (AFD), which suggests the choice of subjects.<br><br>An English summary of the work is published each year in the yearbook on the MS website.- Federico Antoniazzi<br><br><strong>Work by : Vincent Bourgeois, Hamza El Behja, Jean-Jacques Kakanou Kili et Mariette Luscan<\/strong><\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Introduction ","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Introduction <\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Introduction <\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Introduction <\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The transport system in Sousse, Tunisia has undergone significant changes, but is currently inadequate. This project analyzes the situation, proposes a sustainable and efficient public transport solution, and presents potential scenarios. We assess socio-demographic context, key stakeholders (SNCFT, ANME, AMMU, STS), and existing modes, such as private vehicles, STS services, irregular transport, and walking. Comparing scenarios, we consider environmental impact, integration, societal responsibility, accessibility, infrastructure, rolling stock, and service performance. Our proposed solution describes the tramway extension route, urban integration, technical aspects, and economic, social, and environmental benefits. Our goal is to improve transport, enhance quality of life, and promote sustainability in Sousse.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The transport system in Sousse, Tunisia has undergone significant changes, but is currently inadequate. This project analyzes the situation, proposes a sustainable and efficient public transport solution, and presents potential scenarios. We assess socio-demographic context, key stakeholders (SNCFT, ANME, AMMU, STS), and existing modes, such as private vehicles, STS services, irregular transport, and walking. Comparing scenarios, we consider environmental impact, integration, societal responsibility, accessibility, infrastructure, rolling stock, and service performance. Our proposed solution describes the tramway extension route, urban integration, technical aspects, and economic, social, and environmental benefits. Our goal is to improve transport, enhance quality of life, and promote sustainability in Sousse.<\/p>\n","innerContent":["\n<p>The transport system in Sousse, Tunisia has undergone significant changes, but is currently inadequate. This project analyzes the situation, proposes a sustainable and efficient public transport solution, and presents potential scenarios. We assess socio-demographic context, key stakeholders (SNCFT, ANME, AMMU, STS), and existing modes, such as private vehicles, STS services, irregular transport, and walking. Comparing scenarios, we consider environmental impact, integration, societal responsibility, accessibility, infrastructure, rolling stock, and service performance. Our proposed solution describes the tramway extension route, urban integration, technical aspects, and economic, social, and environmental benefits. Our goal is to improve transport, enhance quality of life, and promote sustainability in Sousse.<\/p>\n"],"rendered":"\n<p>The transport system in Sousse, Tunisia has undergone significant changes, but is currently inadequate. This project analyzes the situation, proposes a sustainable and efficient public transport solution, and presents potential scenarios. We assess socio-demographic context, key stakeholders (SNCFT, ANME, AMMU, STS), and existing modes, such as private vehicles, STS services, irregular transport, and walking. Comparing scenarios, we consider environmental impact, integration, societal responsibility, accessibility, infrastructure, rolling stock, and service performance. Our proposed solution describes the tramway extension route, urban integration, technical aspects, and economic, social, and environmental benefits. Our goal is to improve transport, enhance quality of life, and promote sustainability in Sousse.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><\/p>\n","innerContent":["\n<p><\/p>\n"],"rendered":"\n<p><\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Diagnosis","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Diagnosis<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Diagnosis<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Diagnosis<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The transportation dynamics of the Sousse conurbation indicate that movements within suburban centers predominantly occur on foot, while trips between suburban centers and between these centers and the city center rely heavily on private cars. For individuals without private vehicles, non-regular transportation serves as a relevant alternative.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The transportation dynamics of the Sousse conurbation indicate that movements within suburban centers predominantly occur on foot, while trips between suburban centers and between these centers and the city center rely heavily on private cars. For individuals without private vehicles, <a>non-regular transportation <\/a>serves as a relevant alternative.<\/p>\n","innerContent":["\n<p>The transportation dynamics of the Sousse conurbation indicate that movements within suburban centers predominantly occur on foot, while trips between suburban centers and between these centers and the city center rely heavily on private cars. For individuals without private vehicles, <a>non-regular transportation <\/a>serves as a relevant alternative.<\/p>\n"],"rendered":"\n<p>The transportation dynamics of the Sousse conurbation indicate that movements within suburban centers predominantly occur on foot, while trips between suburban centers and between these centers and the city center rely heavily on private cars. For individuals without private vehicles, <a>non-regular transportation <\/a>serves as a relevant alternative.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Our project focuses on travel between the different centers, highlighting the following key flows:","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Our project focuses on travel between the different centers, highlighting the following key flows:<\/p>\n","innerContent":["\n<p>Our project focuses on travel between the different centers, highlighting the following key flows:<\/p>\n"],"rendered":"\n<p>Our project focuses on travel between the different centers, highlighting the following key flows:<\/p>\n"},{"blockName":"core\/list","attrs":{"ordered":false,"values":"\n\n\n\n","type":"","start":0,"reversed":false,"placeholder":"","lock":[],"metadata":[],"className":"wp-block-list","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Northwest: Kal\u00e2a K\u00e9bira, Akouda, and Sousse.","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Northwest: Kal\u00e2a K\u00e9bira, Akouda, and Sousse.<\/li>\n","innerContent":["\n<li>Northwest: Kal\u00e2a K\u00e9bira, Akouda, and Sousse.<\/li>\n"],"rendered":"\n<li>Northwest: Kal\u00e2a K\u00e9bira, Akouda, and Sousse.<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"South\/Southwest: Cit\u00e9 Ezzohour and Sousse, as well as Zawia Sousse and Sousse.","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>South\/Southwest: Cit\u00e9 Ezzohour and Sousse, as well as Zawia Sousse and Sousse.<\/li>\n","innerContent":["\n<li>South\/Southwest: Cit\u00e9 Ezzohour and Sousse, as well as Zawia Sousse and Sousse.<\/li>\n"],"rendered":"\n<li>South\/Southwest: Cit\u00e9 Ezzohour and Sousse, as well as Zawia Sousse and Sousse.<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"West: Kal\u00e2a Sghira and Sousse.","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>West: Kal\u00e2a Sghira and Sousse.<\/li>\n","innerContent":["\n<li>West: Kal\u00e2a Sghira and Sousse.<\/li>\n"],"rendered":"\n<li>West: Kal\u00e2a Sghira and Sousse.<\/li>\n"}],"innerHTML":"\n<ul class=\"wp-block-list\">\n\n\n\n<\/ul>\n","innerContent":["\n<ul class=\"wp-block-list\">",null,"\n\n",null,"\n\n",null,"<\/ul>\n"],"rendered":"\n<ul class=\"wp-block-list\">\n<li>Northwest: Kal\u00e2a K\u00e9bira, Akouda, and Sousse.<\/li>\n\n\n\n<li>South\/Southwest: Cit\u00e9 Ezzohour and Sousse, as well as Zawia Sousse and Sousse.<\/li>\n\n\n\n<li>West: Kal\u00e2a Sghira and Sousse.<\/li>\n<\/ul>\n"},{"blockName":"core\/image","attrs":{"id":5573,"width":"564px","height":"399px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-1024x724.png","alt":"","caption":"Main flows for current transport modes in the Sousse conurbation \u00a9 Hamza El Behja, 2023 (map data: GoogleMaps).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-1024x724.png\" alt=\"\" class=\"wp-image-5573\" style=\"width:564px;height:399px\"\/><figcaption class=\"wp-element-caption\">Main flows for current transport modes in the Sousse conurbation \u00a9 Hamza El Behja, 2023 (map data: GoogleMaps).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-1024x724.png\" alt=\"\" class=\"wp-image-5573\" style=\"width:564px;height:399px\"\/><figcaption class=\"wp-element-caption\">Main flows for current transport modes in the Sousse conurbation \u00a9 Hamza El Behja, 2023 (map data: GoogleMaps).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure1-1024x724.png\" alt=\"\" class=\"wp-image-5573\" style=\"width:564px;height:399px\"\/><figcaption class=\"wp-element-caption\">Main flows for current transport modes in the Sousse conurbation \u00a9 Hamza El Behja, 2023 (map data: GoogleMaps).<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Sousse boasts a dynamic economy driving an anticipated rise in transportation demand. Trip-generating areas are located around the city center, providing a favorable environment for establishing an efficient public transportation system. However, challenges do remain. The convergence of commuting towards the historic center underscores the insufficient public transportation network across the conurbation. The struggling SNCFT faces limitations in executing large-scale projects.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Sousse boasts a dynamic economy driving an anticipated rise in transportation demand. Trip-generating areas are located around the city center, providing a favorable environment for establishing an efficient public transportation system. However, challenges do remain. The convergence of commuting towards the historic center underscores the insufficient public transportation network across the conurbation. The struggling SNCFT faces limitations in executing large-scale projects.<\/p>\n","innerContent":["\n<p>Sousse boasts a dynamic economy driving an anticipated rise in transportation demand. Trip-generating areas are located around the city center, providing a favorable environment for establishing an efficient public transportation system. However, challenges do remain. The convergence of commuting towards the historic center underscores the insufficient public transportation network across the conurbation. The struggling SNCFT faces limitations in executing large-scale projects.<\/p>\n"],"rendered":"\n<p>Sousse boasts a dynamic economy driving an anticipated rise in transportation demand. Trip-generating areas are located around the city center, providing a favorable environment for establishing an efficient public transportation system. However, challenges do remain. The convergence of commuting towards the historic center underscores the insufficient public transportation network across the conurbation. The struggling SNCFT faces limitations in executing large-scale projects.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Opportunities are arising with the recently-established mobility organizing authority, promising improved mobility policies. The presence of underutilized rail networks and stations presents possibilities for revitalization.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Opportunities are arising with the recently-established mobility organizing authority, promising improved mobility policies. The presence of underutilized rail networks and stations presents possibilities for revitalization.<\/p>\n","innerContent":["\n<p>Opportunities are arising with the recently-established mobility organizing authority, promising improved mobility policies. The presence of underutilized rail networks and stations presents possibilities for revitalization.<\/p>\n"],"rendered":"\n<p>Opportunities are arising with the recently-established mobility organizing authority, promising improved mobility policies. The presence of underutilized rail networks and stations presents possibilities for revitalization.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Nevertheless, potential threats include political instability affecting decision-making, and defining employment arrangements for the employees of the new operators.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Nevertheless, potential threats include political instability affecting decision-making, and defining employment arrangements for the employees of the new operators.<\/p>\n","innerContent":["\n<p>Nevertheless, potential threats include political instability affecting decision-making, and defining employment arrangements for the employees of the new operators.<\/p>\n"],"rendered":"\n<p>Nevertheless, potential threats include political instability affecting decision-making, and defining employment arrangements for the employees of the new operators.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"To solve these issues, we must design a transportation system that caters directly to the major trip-generating centers, ensuring an attractive service that encourages a shift towards rail transportation. Establishing a structuring axis within the conurbation facilitates intermodal hubs and overcomes SNCFT limitations.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>To solve these issues, we must design a transportation system that caters directly to the major trip-generating centers, ensuring an attractive service that encourages a shift towards rail transportation. Establishing a structuring axis within the conurbation facilitates intermodal hubs and overcomes SNCFT limitations.<\/p>\n","innerContent":["\n<p>To solve these issues, we must design a transportation system that caters directly to the major trip-generating centers, ensuring an attractive service that encourages a shift towards rail transportation. Establishing a structuring axis within the conurbation facilitates intermodal hubs and overcomes SNCFT limitations.<\/p>\n"],"rendered":"\n<p>To solve these issues, we must design a transportation system that caters directly to the major trip-generating centers, ensuring an attractive service that encourages a shift towards rail transportation. Establishing a structuring axis within the conurbation facilitates intermodal hubs and overcomes SNCFT limitations.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Scenario","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Scenario<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Scenario<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Scenario<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"This project proposes to extend the Sahel Metro with a new tram line from Sousse Bab Jedid to Sousse Ville, Akouda, and Kal\u00e2a K\u00e9bira. The tram-train system integrates the urban and railway segments, covering a total distance of 87km. By using electric power, it reduces road pollution significantly. The route follows existing roads, optimizing space but requiring traffic flow reorganization during construction.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>This project proposes to extend the Sahel Metro with a new tram line from Sousse Bab Jedid to Sousse Ville, Akouda, and Kal\u00e2a K\u00e9bira. The tram-train system integrates the urban and railway segments, covering a total distance of 87km. By using electric power, it reduces road pollution significantly. The route follows existing roads, optimizing space but requiring traffic flow reorganization during construction.<\/p>\n","innerContent":["\n<p>This project proposes to extend the Sahel Metro with a new tram line from Sousse Bab Jedid to Sousse Ville, Akouda, and Kal\u00e2a K\u00e9bira. The tram-train system integrates the urban and railway segments, covering a total distance of 87km. By using electric power, it reduces road pollution significantly. The route follows existing roads, optimizing space but requiring traffic flow reorganization during construction.<\/p>\n"],"rendered":"\n<p>This project proposes to extend the Sahel Metro with a new tram line from Sousse Bab Jedid to Sousse Ville, Akouda, and Kal\u00e2a K\u00e9bira. The tram-train system integrates the urban and railway segments, covering a total distance of 87km. By using electric power, it reduces road pollution significantly. The route follows existing roads, optimizing space but requiring traffic flow reorganization during construction.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"This scenario serves the growing Sousse conurbation, connecting the northern suburbs and key population centers. It enables the creation of multiple tramway stops, improving local accessibility. Intermodal hubs can be established in Sousse, Akouda, and Kal\u00e2a K\u00e9bira facilitating seamless transfers between modes.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>This scenario serves the growing Sousse conurbation, connecting the northern suburbs and key population centers. It enables the creation of multiple tramway stops, improving local accessibility. Intermodal hubs can be established in Sousse, Akouda, and Kal\u00e2a K\u00e9bira facilitating seamless transfers between modes.<\/p>\n","innerContent":["\n<p>This scenario serves the growing Sousse conurbation, connecting the northern suburbs and key population centers. It enables the creation of multiple tramway stops, improving local accessibility. Intermodal hubs can be established in Sousse, Akouda, and Kal\u00e2a K\u00e9bira facilitating seamless transfers between modes.<\/p>\n"],"rendered":"\n<p>This scenario serves the growing Sousse conurbation, connecting the northern suburbs and key population centers. It enables the creation of multiple tramway stops, improving local accessibility. Intermodal hubs can be established in Sousse, Akouda, and Kal\u00e2a K\u00e9bira facilitating seamless transfers between modes.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Infrastructure-wise, it utilizes the existing Sahel Metro infrastructure for railways and constructs new tracks for the urban section. Tram signaling employs the STBS technology, while the railway section retains the automatic block system. The required tram-train rolling stock operates on 750V for urban areas and 25kV for railways, and is readily available.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Infrastructure-wise, it utilizes the existing Sahel Metro infrastructure for railways and constructs new tracks for the urban section. Tram signaling employs the STBS technology, while the railway section retains the automatic block system. The required tram-train rolling stock operates on 750V for urban areas and 25kV for railways, and is readily available.<\/p>\n","innerContent":["\n<p>Infrastructure-wise, it utilizes the existing Sahel Metro infrastructure for railways and constructs new tracks for the urban section. Tram signaling employs the STBS technology, while the railway section retains the automatic block system. The required tram-train rolling stock operates on 750V for urban areas and 25kV for railways, and is readily available.<\/p>\n"],"rendered":"\n<p>Infrastructure-wise, it utilizes the existing Sahel Metro infrastructure for railways and constructs new tracks for the urban section. Tram signaling employs the STBS technology, while the railway section retains the automatic block system. The required tram-train rolling stock operates on 750V for urban areas and 25kV for railways, and is readily available.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Based on a multicriteria analysis, this project outperformed other scenarios. It extends the Sahel Metro as a tram-train system, fulfilling the project\u2019s objectives. Concerns about available rolling stock have been resolved. The scenario meets transportation needs, promoting sustainable modal shifts.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Based on a multicriteria analysis, this project outperformed other scenarios. It extends the Sahel Metro as a tram-train system, fulfilling the project\u2019s objectives. Concerns about available rolling stock have been resolved. The scenario meets transportation needs, promoting sustainable modal shifts.<\/p>\n","innerContent":["\n<p>Based on a multicriteria analysis, this project outperformed other scenarios. It extends the Sahel Metro as a tram-train system, fulfilling the project\u2019s objectives. Concerns about available rolling stock have been resolved. The scenario meets transportation needs, promoting sustainable modal shifts.<\/p>\n"],"rendered":"\n<p>Based on a multicriteria analysis, this project outperformed other scenarios. It extends the Sahel Metro as a tram-train system, fulfilling the project\u2019s objectives. Concerns about available rolling stock have been resolved. The scenario meets transportation needs, promoting sustainable modal shifts.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5575,"width":"400px","height":"560px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2-732x1024.png","alt":"","caption":"Map of the chosen scenario \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2-732x1024.png\" alt=\"\" class=\"wp-image-5575\" style=\"width:400px;height:560px\"\/><figcaption class=\"wp-element-caption\">Map of the chosen scenario \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2-732x1024.png\" alt=\"\" class=\"wp-image-5575\" style=\"width:400px;height:560px\"\/><figcaption class=\"wp-element-caption\">Map of the chosen scenario \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure2-732x1024.png\" alt=\"\" class=\"wp-image-5575\" style=\"width:400px;height:560px\"\/><figcaption class=\"wp-element-caption\">Map of the chosen scenario \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><\/p>\n","innerContent":["\n<p><\/p>\n"],"rendered":"\n<p><\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Route and stations","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Route and stations<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Route and stations<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Route and stations<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The track runs for a total length of 84km, as follows:","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The track runs for a total length of 84km, as follows:<\/p>\n","innerContent":["\n<p>The track runs for a total length of 84km, as follows:<\/p>\n"],"rendered":"\n<p>The track runs for a total length of 84km, as follows:<\/p>\n"},{"blockName":"core\/list","attrs":{"ordered":false,"values":"\n\n","type":"","start":0,"reversed":false,"placeholder":"","lock":[],"metadata":[],"className":"wp-block-list","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"An urban zone: from Kalaa Kebira to Sousse Bab Jedid.","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>An urban zone: from Kalaa Kebira to Sousse Bab Jedid.<\/li>\n","innerContent":["\n<li>An urban zone: from Kalaa Kebira to Sousse Bab Jedid.<\/li>\n"],"rendered":"\n<li>An urban zone: from Kalaa Kebira to Sousse Bab Jedid.<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"A railway zone: from Sousse Bab Jedid to Mahdia.","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>A railway zone: from Sousse Bab Jedid to Mahdia.<\/li>\n","innerContent":["\n<li>A railway zone: from Sousse Bab Jedid to Mahdia.<\/li>\n"],"rendered":"\n<li>A railway zone: from Sousse Bab Jedid to Mahdia.<\/li>\n"}],"innerHTML":"\n<ul class=\"wp-block-list\">\n\n<\/ul>\n","innerContent":["\n<ul class=\"wp-block-list\">",null,"\n\n",null,"<\/ul>\n"],"rendered":"\n<ul class=\"wp-block-list\">\n<li>An urban zone: from Kalaa Kebira to Sousse Bab Jedid.<\/li>\n\n\n\n<li>A railway zone: from Sousse Bab Jedid to Mahdia.<\/li>\n<\/ul>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The railway part of the route follows the current Sahel Metro route. The urban part of the route, the extension itself, needs to be determined.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The railway part of the route follows the current Sahel Metro route. The urban part of the route, the extension itself, needs to be determined.<\/p>\n","innerContent":["\n<p>The railway part of the route follows the current Sahel Metro route. The urban part of the route, the extension itself, needs to be determined.<\/p>\n"],"rendered":"\n<p>The railway part of the route follows the current Sahel Metro route. The urban part of the route, the extension itself, needs to be determined.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The route of the urban part was designed to follow engineering rules, to limit the impact on land by using existing roads, to facilitate the urban integration of the new transport system, and to allow the creation of intermodal hubs.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The route of the urban part was designed to follow engineering rules, to limit the impact on land by using existing roads, to facilitate the urban integration of the new transport system, and to allow the creation of intermodal hubs.<\/p>\n","innerContent":["\n<p>The route of the urban part was designed to follow engineering rules, to limit the impact on land by using existing roads, to facilitate the urban integration of the new transport system, and to allow the creation of intermodal hubs.<\/p>\n"],"rendered":"\n<p>The route of the urban part was designed to follow engineering rules, to limit the impact on land by using existing roads, to facilitate the urban integration of the new transport system, and to allow the creation of intermodal hubs.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The chosen route for the tram-train extension is composed of 5 different sections shown on the following diagram:","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The chosen route for the tram-train extension is composed of 5 different sections shown on the following diagram:<\/p>\n","innerContent":["\n<p>The chosen route for the tram-train extension is composed of 5 different sections shown on the following diagram:<\/p>\n"],"rendered":"\n<p>The chosen route for the tram-train extension is composed of 5 different sections shown on the following diagram:<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><\/p>\n","innerContent":["\n<p><\/p>\n"],"rendered":"\n<p><\/p>\n"},{"blockName":"core\/image","attrs":{"id":5577,"width":"532px","height":"293px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-1024x564.png","alt":"","caption":"Chosen route \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-1024x564.png\" alt=\"\" class=\"wp-image-5577\" style=\"width:532px;height:293px\"\/><figcaption class=\"wp-element-caption\">Chosen route \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-1024x564.png\" alt=\"\" class=\"wp-image-5577\" style=\"width:532px;height:293px\"\/><figcaption class=\"wp-element-caption\">Chosen route \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure3-1024x564.png\" alt=\"\" class=\"wp-image-5577\" style=\"width:532px;height:293px\"\/><figcaption class=\"wp-element-caption\">Chosen route \u00a9 Mariette Luscan, 2023 (map data: OpenStreetMaps contributors, CC BY-SA).<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The new 14km of urban line enables the creation of 27 new stations (interstation of 500m on average). Their location allows connections with the existing transport network.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The new 14km of urban line enables the creation of 27 new stations (interstation of 500m on average). Their location allows connections with the existing transport network.<\/p>\n","innerContent":["\n<p>The new 14km of urban line enables the creation of 27 new stations (interstation of 500m on average). Their location allows connections with the existing transport network.<\/p>\n"],"rendered":"\n<p>The new 14km of urban line enables the creation of 27 new stations (interstation of 500m on average). Their location allows connections with the existing transport network.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Traffic study","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Traffic study<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Traffic study<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Traffic study<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The traffic analysis includes both external and internal flows.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The traffic analysis includes both external and internal flows.<\/p>\n","innerContent":["\n<p>The traffic analysis includes both external and internal flows.<\/p>\n"],"rendered":"\n<p>The traffic analysis includes both external and internal flows.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"For the external flows, the Sahel Metro contributes 16,200 passengers per day to the urban section of the tram-train.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>For the external flows, the Sahel Metro contributes 16,200 passengers per day to the urban section of the tram-train.<\/p>\n","innerContent":["\n<p>For the external flows, the Sahel Metro contributes 16,200 passengers per day to the urban section of the tram-train.<\/p>\n"],"rendered":"\n<p>For the external flows, the Sahel Metro contributes 16,200 passengers per day to the urban section of the tram-train.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Regarding the internal flows, two calculation methods were employed. The first method was based on modal shift and mode choice, and the second method considers the tram-train\u2019s attraction area and modal share. After evaluating the results from both methods, the average internal flow was determined to be 34,771 passengers per day.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Regarding the internal flows, two calculation methods were employed. The first method was based on modal shift and mode choice, and the second method considers the tram-train\u2019s attraction area and modal share. After evaluating the results from both methods, the average internal flow was determined to be 34,771 passengers per day.<\/p>\n","innerContent":["\n<p>Regarding the internal flows, two calculation methods were employed. The first method was based on modal shift and mode choice, and the second method considers the tram-train\u2019s attraction area and modal share. After evaluating the results from both methods, the average internal flow was determined to be 34,771 passengers per day.<\/p>\n"],"rendered":"\n<p>Regarding the internal flows, two calculation methods were employed. The first method was based on modal shift and mode choice, and the second method considers the tram-train\u2019s attraction area and modal share. After evaluating the results from both methods, the average internal flow was determined to be 34,771 passengers per day.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The total flow, combining the external and internal flows, amounts to 50,971 passengers per day. Based on this analysis, the calculated PPHPD for the Sahel Metro project is 4,720 passengers per hour per direction.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The total flow, combining the external and internal flows, amounts to 50,971 passengers per day. Based on this analysis, the calculated PPHPD for the Sahel Metro project is 4,720 passengers per hour per direction.<\/p>\n","innerContent":["\n<p>The total flow, combining the external and internal flows, amounts to 50,971 passengers per day. Based on this analysis, the calculated PPHPD for the Sahel Metro project is 4,720 passengers per hour per direction.<\/p>\n"],"rendered":"\n<p>The total flow, combining the external and internal flows, amounts to 50,971 passengers per day. Based on this analysis, the calculated PPHPD for the Sahel Metro project is 4,720 passengers per hour per direction.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"This finding confirms the relevance and viability of implementing the tram-train system in Sousse, as the PPHPD falls within the expected range for tramway projects.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>This finding confirms the relevance and viability of implementing the tram-train system in Sousse, as the PPHPD falls within the expected range for tramway projects.<\/p>\n","innerContent":["\n<p>This finding confirms the relevance and viability of implementing the tram-train system in Sousse, as the PPHPD falls within the expected range for tramway projects.<\/p>\n"],"rendered":"\n<p>This finding confirms the relevance and viability of implementing the tram-train system in Sousse, as the PPHPD falls within the expected range for tramway projects.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Operation","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Operation<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Operation<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Operation<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Managing tram-train operations is challenging due to the mix of urban and interurban environments. The current Sahel Metro will be replaced by a tram-train service. Advantages include exclusive infrastructure for tram-trains and improved service quality. Disadvantages include complications for SNCFT and the loss of an important market. This option offers a higher-quality transport service and efficient operation.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Managing tram-train operations is challenging due to the mix of urban and interurban environments. The current Sahel Metro will be replaced by a tram-train service. Advantages include exclusive infrastructure for tram-trains and improved service quality. Disadvantages include complications for SNCFT and the loss of an important market. This option offers a higher-quality transport service and efficient operation.<\/p>\n","innerContent":["\n<p>Managing tram-train operations is challenging due to the mix of urban and interurban environments. The current Sahel Metro will be replaced by a tram-train service. Advantages include exclusive infrastructure for tram-trains and improved service quality. Disadvantages include complications for SNCFT and the loss of an important market. This option offers a higher-quality transport service and efficient operation.<\/p>\n"],"rendered":"\n<p>Managing tram-train operations is challenging due to the mix of urban and interurban environments. The current Sahel Metro will be replaced by a tram-train service. Advantages include exclusive infrastructure for tram-trains and improved service quality. Disadvantages include complications for SNCFT and the loss of an important market. This option offers a higher-quality transport service and efficient operation.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"High-frequency service will be provided during peak and off-peak hours. Frequencies on the railway section will improve the Sousse - Monastir - Mahdia corridor compared to the current Sahel Metro.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>High-frequency service will be provided during peak and off-peak hours. Frequencies on the railway section will improve the Sousse - Monastir - Mahdia corridor compared to the current Sahel Metro.<\/p>\n","innerContent":["\n<p>High-frequency service will be provided during peak and off-peak hours. Frequencies on the railway section will improve the Sousse - Monastir - Mahdia corridor compared to the current Sahel Metro.<\/p>\n"],"rendered":"\n<p>High-frequency service will be provided during peak and off-peak hours. Frequencies on the railway section will improve the Sousse - Monastir - Mahdia corridor compared to the current Sahel Metro.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5581,"width":"450px","height":"110px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-1024x250.png","alt":"","caption":"Frequency on each section at peak-hours \u00a9 Vincent Bourgeois, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-1024x250.png\" alt=\"\" class=\"wp-image-5581\" style=\"width:450px;height:110px\"\/><figcaption class=\"wp-element-caption\">Frequency on each section at peak-hours \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-1024x250.png\" alt=\"\" class=\"wp-image-5581\" style=\"width:450px;height:110px\"\/><figcaption class=\"wp-element-caption\">Frequency on each section at peak-hours \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure4-1024x250.png\" alt=\"\" class=\"wp-image-5581\" style=\"width:450px;height:110px\"\/><figcaption class=\"wp-element-caption\">Frequency on each section at peak-hours \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Rolling stock will be optimized and a single omnibus mission type will be offered.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Rolling stock will be optimized and a single omnibus mission type will be offered.<\/p>\n","innerContent":["\n<p>Rolling stock will be optimized and a single omnibus mission type will be offered.<\/p>\n"],"rendered":"\n<p>Rolling stock will be optimized and a single omnibus mission type will be offered.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Tram\u2019s commercial speed is 20km\/h with 40-second station stops. The Sahel Metro train\u2019s commercial speed is 52km\/h with 1-minute station stops.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Tram\u2019s commercial speed is 20km\/h with 40-second station stops. The Sahel Metro train\u2019s commercial speed is 52km\/h with 1-minute station stops.<\/p>\n","innerContent":["\n<p>Tram\u2019s commercial speed is 20km\/h with 40-second station stops. The Sahel Metro train\u2019s commercial speed is 52km\/h with 1-minute station stops.<\/p>\n"],"rendered":"\n<p>Tram\u2019s commercial speed is 20km\/h with 40-second station stops. The Sahel Metro train\u2019s commercial speed is 52km\/h with 1-minute station stops.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Rolling Stock","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Rolling Stock<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Rolling Stock<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Rolling Stock<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Tram-train rolling stock will be meter-gauge and limited to a 65-meter platform length. A 160m\u00b2 tram-train, 60 meters long, with 340 seats and foldable seats for a capacity of 385, is proposed due to project constraints and passenger demand.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Tram-train rolling stock will be meter-gauge and limited to a 65-meter platform length. A 160m\u00b2 tram-train, 60 meters long, with 340 seats and foldable seats for a capacity of 385, is proposed due to project constraints and passenger demand.<\/p>\n","innerContent":["\n<p>Tram-train rolling stock will be meter-gauge and limited to a 65-meter platform length. A 160m\u00b2 tram-train, 60 meters long, with 340 seats and foldable seats for a capacity of 385, is proposed due to project constraints and passenger demand.<\/p>\n"],"rendered":"\n<p>Tram-train rolling stock will be meter-gauge and limited to a 65-meter platform length. A 160m\u00b2 tram-train, 60 meters long, with 340 seats and foldable seats for a capacity of 385, is proposed due to project constraints and passenger demand.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"To determine fleet size, peak-hour traffic and frequencies were considered :","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>To determine fleet size, peak-hour traffic and frequencies were considered :<\/p>\n","innerContent":["\n<p>To determine fleet size, peak-hour traffic and frequencies were considered :<\/p>\n"],"rendered":"\n<p>To determine fleet size, peak-hour traffic and frequencies were considered :<\/p>\n"},{"blockName":"core\/list","attrs":{"ordered":false,"values":"\n\n\n\n","type":"","start":0,"reversed":false,"placeholder":"","lock":[],"metadata":[],"className":"wp-block-list","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Sousse City segment requires 24 trains at a 4-minute frequency","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Sousse City segment requires 24 trains at a 4-minute frequency<\/li>\n","innerContent":["\n<li>Sousse City segment requires 24 trains at a 4-minute frequency<\/li>\n"],"rendered":"\n<li>Sousse City segment requires 24 trains at a 4-minute frequency<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Sousse-Monastir segment needs 4 trains at a 15-minute frequency","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Sousse-Monastir segment needs 4 trains at a 15-minute frequency<\/li>\n","innerContent":["\n<li>Sousse-Monastir segment needs 4 trains at a 15-minute frequency<\/li>\n"],"rendered":"\n<li>Sousse-Monastir segment needs 4 trains at a 15-minute frequency<\/li>\n"},{"blockName":"core\/list-item","attrs":{"placeholder":"","content":"Monastir-Mahdia segment requires 4 trains at a 30-minute frequency","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<li>Monastir-Mahdia segment requires 4 trains at a 30-minute frequency<\/li>\n","innerContent":["\n<li>Monastir-Mahdia segment requires 4 trains at a 30-minute frequency<\/li>\n"],"rendered":"\n<li>Monastir-Mahdia segment requires 4 trains at a 30-minute frequency<\/li>\n"}],"innerHTML":"\n<ul class=\"wp-block-list\">\n\n\n\n<\/ul>\n","innerContent":["\n<ul class=\"wp-block-list\">",null,"\n\n",null,"\n\n",null,"<\/ul>\n"],"rendered":"\n<ul class=\"wp-block-list\">\n<li>Sousse City segment requires 24 trains at a 4-minute frequency<\/li>\n\n\n\n<li>Sousse-Monastir segment needs 4 trains at a 15-minute frequency<\/li>\n\n\n\n<li>Monastir-Mahdia segment requires 4 trains at a 30-minute frequency<\/li>\n<\/ul>\n"},{"blockName":"core\/image","attrs":{"id":5583,"width":"492px","height":"257px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5-1024x535.jpg","alt":"","caption":"PPHPD for each section \u00a9 Vincent Bourgeois, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5-1024x535.jpg\" alt=\"\" class=\"wp-image-5583\" style=\"width:492px;height:257px\"\/><figcaption class=\"wp-element-caption\">PPHPD for each section \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5-1024x535.jpg\" alt=\"\" class=\"wp-image-5583\" style=\"width:492px;height:257px\"\/><figcaption class=\"wp-element-caption\">PPHPD for each section \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure5-1024x535.jpg\" alt=\"\" class=\"wp-image-5583\" style=\"width:492px;height:257px\"\/><figcaption class=\"wp-element-caption\">PPHPD for each section \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Factoring in layover and turnaround times, an additional 4 trains are needed. In total, 32 tram-trains are necessary for nominal service. Adding 10% for maintenance and 10% as reserve, 38 trains are required. The fleet size and train storage align with the Space-Time Graph.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Factoring in layover and turnaround times, an additional 4 trains are needed. In total, 32 tram-trains are necessary for nominal service. Adding 10% for maintenance and 10% as reserve, 38 trains are required. The fleet size and train storage align with the Space-Time Graph.<\/p>\n","innerContent":["\n<p>Factoring in layover and turnaround times, an additional 4 trains are needed. In total, 32 tram-trains are necessary for nominal service. Adding 10% for maintenance and 10% as reserve, 38 trains are required. The fleet size and train storage align with the Space-Time Graph.<\/p>\n"],"rendered":"\n<p>Factoring in layover and turnaround times, an additional 4 trains are needed. In total, 32 tram-trains are necessary for nominal service. Adding 10% for maintenance and 10% as reserve, 38 trains are required. The fleet size and train storage align with the Space-Time Graph.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5585,"width":"452px","height":"226px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6-1024x512.png","alt":"","caption":"Space-Time Graph \u00a9 Vincent Bourgeois, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6-1024x512.png\" alt=\"\" class=\"wp-image-5585\" style=\"width:452px;height:226px\"\/><figcaption class=\"wp-element-caption\">Space-Time Graph \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6-1024x512.png\" alt=\"\" class=\"wp-image-5585\" style=\"width:452px;height:226px\"\/><figcaption class=\"wp-element-caption\">Space-Time Graph \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure6-1024x512.png\" alt=\"\" class=\"wp-image-5585\" style=\"width:452px;height:226px\"\/><figcaption class=\"wp-element-caption\">Space-Time Graph \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Technical choices and infrastructure ","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Technical choices and infrastructure <\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Technical choices and infrastructure <\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Technical choices and infrastructure <\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"As far as the train section is concerned, the project includes significant enhancements, such as removing 10 level crossings, renovating 20% of deteriorated sections, securing railway areas, and upgrading the Monastir signaling control system to computer-based interlocking. Tram infrastructure focuses on key intersections, using existing road bridges and constructing a new one at Kal\u00e2a K\u00e9bira station. The tramway platform utilizes continuous concrete track with embedded rails and steel fastenings. Drainage includes canals between and alongside the tracks.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>As far as the train section is concerned, the project includes significant enhancements, such as removing 10 level crossings, renovating 20% of deteriorated sections, securing railway areas, and upgrading the Monastir signaling control system to computer-based interlocking. Tram infrastructure focuses on key intersections, using existing road bridges and constructing a new one at Kal\u00e2a K\u00e9bira station. The tramway platform utilizes continuous concrete track with embedded rails and steel fastenings. Drainage includes canals between and alongside the tracks.<\/p>\n","innerContent":["\n<p>As far as the train section is concerned, the project includes significant enhancements, such as removing 10 level crossings, renovating 20% of deteriorated sections, securing railway areas, and upgrading the Monastir signaling control system to computer-based interlocking. Tram infrastructure focuses on key intersections, using existing road bridges and constructing a new one at Kal\u00e2a K\u00e9bira station. The tramway platform utilizes continuous concrete track with embedded rails and steel fastenings. Drainage includes canals between and alongside the tracks.<\/p>\n"],"rendered":"\n<p>As far as the train section is concerned, the project includes significant enhancements, such as removing 10 level crossings, renovating 20% of deteriorated sections, securing railway areas, and upgrading the Monastir signaling control system to computer-based interlocking. Tram infrastructure focuses on key intersections, using existing road bridges and constructing a new one at Kal\u00e2a K\u00e9bira station. The tramway platform utilizes continuous concrete track with embedded rails and steel fastenings. Drainage includes canals between and alongside the tracks.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The signaling system adopts France\u2019s STBS (Transmission System on Board and Ground). Tram signaling employs rectangular lights for stop (red bar) and proceed (white\/green bar). Fixed signs display speed limits. Route control relies on the Interlocking system at Le D\u00e9p\u00f4t station. Road intersections have traffic lights that prioritize trams via preemption signals. A total of 162 signals and 198 beacons will be installed, approximately one every 172m along the tram route.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The signaling system adopts France\u2019s STBS (Transmission System on Board and Ground). Tram signaling employs rectangular lights for stop (red bar) and proceed (white\/green bar). Fixed signs display speed limits. Route control relies on the Interlocking system at Le D\u00e9p\u00f4t station. Road intersections have traffic lights that prioritize trams via preemption signals. A total of 162 signals and 198 beacons will be installed, approximately one every 172m along the tram route.<\/p>\n","innerContent":["\n<p>The signaling system adopts France\u2019s STBS (Transmission System on Board and Ground). Tram signaling employs rectangular lights for stop (red bar) and proceed (white\/green bar). Fixed signs display speed limits. Route control relies on the Interlocking system at Le D\u00e9p\u00f4t station. Road intersections have traffic lights that prioritize trams via preemption signals. A total of 162 signals and 198 beacons will be installed, approximately one every 172m along the tram route.<\/p>\n"],"rendered":"\n<p>The signaling system adopts France\u2019s STBS (Transmission System on Board and Ground). Tram signaling employs rectangular lights for stop (red bar) and proceed (white\/green bar). Fixed signs display speed limits. Route control relies on the Interlocking system at Le D\u00e9p\u00f4t station. Road intersections have traffic lights that prioritize trams via preemption signals. A total of 162 signals and 198 beacons will be installed, approximately one every 172m along the tram route.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5587,"width":"360px","height":"220px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-1024x625.png","alt":"","caption":"Representation of the in-station signaling \u00a9 Vincent Bourgeois, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-1024x625.png\" alt=\"\" class=\"wp-image-5587\" style=\"width:360px;height:220px\"\/><figcaption class=\"wp-element-caption\">Representation of the in-station signaling \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-1024x625.png\" alt=\"\" class=\"wp-image-5587\" style=\"width:360px;height:220px\"\/><figcaption class=\"wp-element-caption\">Representation of the in-station signaling \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure7-1024x625.png\" alt=\"\" class=\"wp-image-5587\" style=\"width:360px;height:220px\"\/><figcaption class=\"wp-element-caption\">Representation of the in-station signaling \u00a9 Vincent Bourgeois, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Trams in Sousse operate with 750 V DC power. Transformer-rectifier units convert the public network's 15 kV AC to DC. Substations are spaced 7 km apart, with two substations covering 7 km each for the 14 km tram line, and an additional substation in the middle for reliability purposes. Voltage drop at line ends is compensated by two parallel connection posts. Energy storage units facilitate regenerative braking and provide backup power. Required equipment includes three substations, two connection posts, and two energy storage units. Substations have a nominal power of 3 MW, supporting 9 MW for 1 minute. Peak hours provide an instantaneous power injection of 4.2 MW.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Trams in Sousse operate with 750 V DC power. Transformer-rectifier units convert the public network's 15 kV AC to DC. Substations are spaced 7 km apart, with two substations covering 7 km each for the 14 km tram line, and an additional substation in the middle for reliability purposes. Voltage drop at line ends is compensated by two parallel connection posts. Energy storage units facilitate regenerative braking and provide backup power. Required equipment includes three substations, two connection posts, and two energy storage units. Substations have a nominal power of 3 MW, supporting 9 MW for 1 minute. Peak hours provide an instantaneous power injection of 4.2 MW.<\/p>\n","innerContent":["\n<p>Trams in Sousse operate with 750 V DC power. Transformer-rectifier units convert the public network's 15 kV AC to DC. Substations are spaced 7 km apart, with two substations covering 7 km each for the 14 km tram line, and an additional substation in the middle for reliability purposes. Voltage drop at line ends is compensated by two parallel connection posts. Energy storage units facilitate regenerative braking and provide backup power. Required equipment includes three substations, two connection posts, and two energy storage units. Substations have a nominal power of 3 MW, supporting 9 MW for 1 minute. Peak hours provide an instantaneous power injection of 4.2 MW.<\/p>\n"],"rendered":"\n<p>Trams in Sousse operate with 750 V DC power. Transformer-rectifier units convert the public network's 15 kV AC to DC. Substations are spaced 7 km apart, with two substations covering 7 km each for the 14 km tram line, and an additional substation in the middle for reliability purposes. Voltage drop at line ends is compensated by two parallel connection posts. Energy storage units facilitate regenerative braking and provide backup power. Required equipment includes three substations, two connection posts, and two energy storage units. Substations have a nominal power of 3 MW, supporting 9 MW for 1 minute. Peak hours provide an instantaneous power injection of 4.2 MW.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The Sahel Metro project necessitates four maintenance and storage centers for tram-trains. Centers will be evenly distributed along the line in Sousse, with the main center in Kal\u00e2a K\u00e9bira featuring storage for 15 trains, a 7,000 m\u00b2 building for heavy maintenance, and a 4,000 m\u00b2 building for service and washing. The second center, between Sousse Sud and Sousse Zone Industrielle, offers storage for 18 trains and a 4,000 m\u00b2 maintenance building. Monastir and Mahdia will have storage depots for 3 and 2 tram-trains, respectively, without maintenance facilities.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The Sahel Metro project necessitates four maintenance and storage centers for tram-trains. Centers will be evenly distributed along the line in Sousse, with the main center in Kal\u00e2a K\u00e9bira featuring storage for 15 trains, a 7,000 m\u00b2 building for heavy maintenance, and a 4,000 m\u00b2 building for service and washing. The second center, between Sousse Sud and Sousse Zone Industrielle, offers storage for 18 trains and a 4,000 m\u00b2 maintenance building. Monastir and Mahdia will have storage depots for 3 and 2 tram-trains, respectively, without maintenance facilities.<\/p>\n","innerContent":["\n<p>The Sahel Metro project necessitates four maintenance and storage centers for tram-trains. Centers will be evenly distributed along the line in Sousse, with the main center in Kal\u00e2a K\u00e9bira featuring storage for 15 trains, a 7,000 m\u00b2 building for heavy maintenance, and a 4,000 m\u00b2 building for service and washing. The second center, between Sousse Sud and Sousse Zone Industrielle, offers storage for 18 trains and a 4,000 m\u00b2 maintenance building. Monastir and Mahdia will have storage depots for 3 and 2 tram-trains, respectively, without maintenance facilities.<\/p>\n"],"rendered":"\n<p>The Sahel Metro project necessitates four maintenance and storage centers for tram-trains. Centers will be evenly distributed along the line in Sousse, with the main center in Kal\u00e2a K\u00e9bira featuring storage for 15 trains, a 7,000 m\u00b2 building for heavy maintenance, and a 4,000 m\u00b2 building for service and washing. The second center, between Sousse Sud and Sousse Zone Industrielle, offers storage for 18 trains and a 4,000 m\u00b2 maintenance building. Monastir and Mahdia will have storage depots for 3 and 2 tram-trains, respectively, without maintenance facilities.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5589,"width":"534px","height":"301px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-1024x577.png","alt":"","caption":"Line diagram with the main facilities \u00a9 Vincent Bourgeois, Mariette Luscan, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-1024x577.png\" alt=\"\" class=\"wp-image-5589\" style=\"width:534px;height:301px\"\/><figcaption class=\"wp-element-caption\">Line diagram with the main facilities \u00a9 Vincent Bourgeois, Mariette Luscan, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-1024x577.png\" alt=\"\" class=\"wp-image-5589\" style=\"width:534px;height:301px\"\/><figcaption class=\"wp-element-caption\">Line diagram with the main facilities \u00a9 Vincent Bourgeois, Mariette Luscan, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure8-1024x577.png\" alt=\"\" class=\"wp-image-5589\" style=\"width:534px;height:301px\"\/><figcaption class=\"wp-element-caption\">Line diagram with the main facilities \u00a9 Vincent Bourgeois, Mariette Luscan, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Economic and financial feasibility","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Economic and financial feasibility<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Economic and financial feasibility<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Economic and financial feasibility<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The project cost estimation reveals that civil engineering accounts for nearly 50% of the total cost, with a notable share allocated to the railway section for level crossing elimination and track renewal. Electrification represents over 25% of the cost, primarily focused on the urban area. Signaling, telecommunications, studies, rolling stock, and a risk provision contribute to the remaining expenses. The overall investment cost amounts to \u20ac707 million.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The project cost estimation reveals that civil engineering accounts for nearly 50% of the total cost, with a notable share allocated to the railway section for level crossing elimination and track renewal. Electrification represents over 25% of the cost, primarily focused on the urban area. Signaling, telecommunications, studies, rolling stock, and a risk provision contribute to the remaining expenses. The overall investment cost amounts to \u20ac707 million.<\/p>\n","innerContent":["\n<p>The project cost estimation reveals that civil engineering accounts for nearly 50% of the total cost, with a notable share allocated to the railway section for level crossing elimination and track renewal. Electrification represents over 25% of the cost, primarily focused on the urban area. Signaling, telecommunications, studies, rolling stock, and a risk provision contribute to the remaining expenses. The overall investment cost amounts to \u20ac707 million.<\/p>\n"],"rendered":"\n<p>The project cost estimation reveals that civil engineering accounts for nearly 50% of the total cost, with a notable share allocated to the railway section for level crossing elimination and track renewal. Electrification represents over 25% of the cost, primarily focused on the urban area. Signaling, telecommunications, studies, rolling stock, and a risk provision contribute to the remaining expenses. The overall investment cost amounts to \u20ac707 million.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p><\/p>\n","innerContent":["\n<p><\/p>\n"],"rendered":"\n<p><\/p>\n"},{"blockName":"core\/image","attrs":{"id":5591,"width":"448px","height":"265px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-1024x606.png","alt":"","caption":"Breakdown of the total project cost \u00a9 Jean-Jacques Kakanou Kili, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-1024x606.png\" alt=\"\" class=\"wp-image-5591\" style=\"width:448px;height:265px\"\/><figcaption class=\"wp-element-caption\">Breakdown of the total project cost \u00a9 Jean-Jacques Kakanou Kili, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-1024x606.png\" alt=\"\" class=\"wp-image-5591\" style=\"width:448px;height:265px\"\/><figcaption class=\"wp-element-caption\">Breakdown of the total project cost \u00a9 Jean-Jacques Kakanou Kili, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure9-1024x606.png\" alt=\"\" class=\"wp-image-5591\" style=\"width:448px;height:265px\"\/><figcaption class=\"wp-element-caption\">Breakdown of the total project cost \u00a9 Jean-Jacques Kakanou Kili, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"Regarding the operating and financial balance, operating revenues cover production costs, excluding rolling stock depreciation. However, only 19% of the total charges are covered by operating revenues, necessitating annual subsidies exceeding \u20ac35 million to balance the finances.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>Regarding the operating and financial balance, operating revenues cover production costs, excluding rolling stock depreciation. However, only 19% of the total charges are covered by operating revenues, necessitating annual subsidies exceeding \u20ac35 million to balance the finances.<\/p>\n","innerContent":["\n<p>Regarding the operating and financial balance, operating revenues cover production costs, excluding rolling stock depreciation. However, only 19% of the total charges are covered by operating revenues, necessitating annual subsidies exceeding \u20ac35 million to balance the finances.<\/p>\n"],"rendered":"\n<p>Regarding the operating and financial balance, operating revenues cover production costs, excluding rolling stock depreciation. However, only 19% of the total charges are covered by operating revenues, necessitating annual subsidies exceeding \u20ac35 million to balance the finances.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The socio-economic assessment considers factors such as time savings, cost savings compared to car travel, reductions in CO2 emissions, noise mitigation, and safety improvements. The calculated net present value for the project stands at \u20ac77.2 million, indicating a positive socio-economic impact.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The socio-economic assessment considers factors such as time savings, cost savings compared to car travel, reductions in CO<sub>2<\/sub> emissions, noise mitigation, and safety improvements. The calculated net present value for the project stands at \u20ac77.2 million, indicating a positive socio-economic impact.<\/p>\n","innerContent":["\n<p>The socio-economic assessment considers factors such as time savings, cost savings compared to car travel, reductions in CO<sub>2<\/sub> emissions, noise mitigation, and safety improvements. The calculated net present value for the project stands at \u20ac77.2 million, indicating a positive socio-economic impact.<\/p>\n"],"rendered":"\n<p>The socio-economic assessment considers factors such as time savings, cost savings compared to car travel, reductions in CO<sub>2<\/sub> emissions, noise mitigation, and safety improvements. The calculated net present value for the project stands at \u20ac77.2 million, indicating a positive socio-economic impact.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"In conclusion, the Sahel tram-train project demonstrates economic and financial feasibility, accompanied by significant socio-economic benefits.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>In conclusion, the Sahel tram-train project demonstrates economic and financial feasibility, accompanied by significant socio-economic benefits.<\/p>\n","innerContent":["\n<p>In conclusion, the Sahel tram-train project demonstrates economic and financial feasibility, accompanied by significant socio-economic benefits.<\/p>\n"],"rendered":"\n<p>In conclusion, the Sahel tram-train project demonstrates economic and financial feasibility, accompanied by significant socio-economic benefits.<\/p>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Project set-up","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Project set-up<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Project set-up<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Project set-up<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"In Tunisia, strategic sectors like energy and transportation are managed by state-owned entities. When planning the Sousse tram-train project, the local context must be considered. Long-term private approaches may not suit institutional and social constraints.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>In Tunisia, strategic sectors like energy and transportation are managed by state-owned entities. When planning the Sousse tram-train project, the local context must be considered. Long-term private approaches may not suit institutional and social constraints.<\/p>\n","innerContent":["\n<p>In Tunisia, strategic sectors like energy and transportation are managed by state-owned entities. When planning the Sousse tram-train project, the local context must be considered. Long-term private approaches may not suit institutional and social constraints.<\/p>\n"],"rendered":"\n<p>In Tunisia, strategic sectors like energy and transportation are managed by state-owned entities. When planning the Sousse tram-train project, the local context must be considered. Long-term private approaches may not suit institutional and social constraints.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The public sector faces structural issues that have an impact on service quality, and the expertise of experienced private actors is crucial for success. The project\u2019s structure will balance public-private interests. The core is the public-owned STTC (Sahel Tram-Train Company), managing construction and operation. The Tunisian government, Sahel municipalities, and AMMUS are key stakeholders. Technical expertise will be provided through project owner assistance. Construction will be under public project management. Financing relies on contributions and loans. Operation and maintenance will be contracted to a private organization for 10 years, with STTC remunerating the operator.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The public sector faces structural issues that have an impact on service quality, and the expertise of experienced private actors is crucial for success. The project\u2019s structure will balance public-private interests. The core is the public-owned STTC (Sahel Tram-Train Company), managing construction and operation. The Tunisian government, Sahel municipalities, and AMMUS are key stakeholders. Technical expertise will be provided through project owner assistance. Construction will be under public project management. Financing relies on contributions and loans. Operation and maintenance will be contracted to a private organization for 10 years, with STTC remunerating the operator.<\/p>\n","innerContent":["\n<p>The public sector faces structural issues that have an impact on service quality, and the expertise of experienced private actors is crucial for success. The project\u2019s structure will balance public-private interests. The core is the public-owned STTC (Sahel Tram-Train Company), managing construction and operation. The Tunisian government, Sahel municipalities, and AMMUS are key stakeholders. Technical expertise will be provided through project owner assistance. Construction will be under public project management. Financing relies on contributions and loans. Operation and maintenance will be contracted to a private organization for 10 years, with STTC remunerating the operator.<\/p>\n"],"rendered":"\n<p>The public sector faces structural issues that have an impact on service quality, and the expertise of experienced private actors is crucial for success. The project\u2019s structure will balance public-private interests. The core is the public-owned STTC (Sahel Tram-Train Company), managing construction and operation. The Tunisian government, Sahel municipalities, and AMMUS are key stakeholders. Technical expertise will be provided through project owner assistance. Construction will be under public project management. Financing relies on contributions and loans. Operation and maintenance will be contracted to a private organization for 10 years, with STTC remunerating the operator.<\/p>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"The project involves a private operator for the entire tram-train line, including Monastir-Mahdia. Legislative separation of infrastructure management and operations is a prerequisite. SNCFT will retain infrastructure management and delegate rolling stock operation to the new operator. Staff and maintenance personnel will be transferred under negotiated conditions.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>The project involves a private operator for the entire tram-train line, including Monastir-Mahdia. Legislative separation of infrastructure management and operations is a prerequisite. SNCFT will retain infrastructure management and delegate rolling stock operation to the new operator. Staff and maintenance personnel will be transferred under negotiated conditions.<\/p>\n","innerContent":["\n<p>The project involves a private operator for the entire tram-train line, including Monastir-Mahdia. Legislative separation of infrastructure management and operations is a prerequisite. SNCFT will retain infrastructure management and delegate rolling stock operation to the new operator. Staff and maintenance personnel will be transferred under negotiated conditions.<\/p>\n"],"rendered":"\n<p>The project involves a private operator for the entire tram-train line, including Monastir-Mahdia. Legislative separation of infrastructure management and operations is a prerequisite. SNCFT will retain infrastructure management and delegate rolling stock operation to the new operator. Staff and maintenance personnel will be transferred under negotiated conditions.<\/p>\n"},{"blockName":"core\/image","attrs":{"id":5593,"width":"538px","height":"447px","sizeSlug":"large","linkDestination":"none","align":"center","blob":"","url":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-1024x851.png","alt":"","caption":"Project set-up diagram \u00a9 Hamza El Behja, 2023.","lightbox":[],"title":"","href":"","rel":"","linkClass":"","aspectRatio":"","scale":"","linkTarget":"","lock":[],"metadata":[],"className":"wp-block-image aligncenter size-large is-resized","style":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-1024x851.png\" alt=\"\" class=\"wp-image-5593\" style=\"width:538px;height:447px\"\/><figcaption class=\"wp-element-caption\">Project set-up diagram \u00a9 Hamza El Behja, 2023.<\/figcaption><\/figure>\n","innerContent":["\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-1024x851.png\" alt=\"\" class=\"wp-image-5593\" style=\"width:538px;height:447px\"\/><figcaption class=\"wp-element-caption\">Project set-up diagram \u00a9 Hamza El Behja, 2023.<\/figcaption><\/figure>\n"],"rendered":"\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_figure10-1024x851.png\" alt=\"\" class=\"wp-image-5593\" style=\"width:538px;height:447px\"\/><figcaption class=\"wp-element-caption\">Project set-up diagram \u00a9 Hamza El Behja, 2023.<\/figcaption><\/figure>\n"},{"blockName":"core\/heading","attrs":{"textColor":"red","textAlign":"","content":"Conclusion","level":2,"levelOptions":[],"placeholder":"","lock":[],"metadata":[],"align":"","className":"wp-block-heading has-red-color has-text-color","style":"","backgroundColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conclusion<\/h2>\n","innerContent":["\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conclusion<\/h2>\n"],"rendered":"\n<h2 class=\"wp-block-heading has-red-color has-text-color\">Conclusion<\/h2>\n"},{"blockName":"core\/paragraph","attrs":{"align":"","content":"To conclude, the proposed Sahel tram-train project offers a sustainable and efficient solution to the transport challenges of Sousse. It is economically viable, with significant socio-economic benefits. Collaboration between public and private stakeholders is essential for successful implementation and improved transport in Sousse.","dropCap":false,"placeholder":"","direction":"","lock":[],"metadata":[],"className":"","style":"","backgroundColor":"","textColor":"","gradient":"","fontSize":"","fontFamily":"","borderColor":"","anchor":""},"innerBlocks":[],"innerHTML":"\n<p>To conclude, the proposed Sahel tram-train project offers a sustainable and efficient solution to the transport challenges of Sousse. It is economically viable, with significant socio-economic benefits. Collaboration between public and private stakeholders is essential for successful implementation and improved transport in Sousse.<\/p>\n","innerContent":["\n<p>To conclude, the proposed Sahel tram-train project offers a sustainable and efficient solution to the transport challenges of Sousse. It is economically viable, with significant socio-economic benefits. Collaboration between public and private stakeholders is essential for successful implementation and improved transport in Sousse.<\/p>\n"],"rendered":"\n<p>To conclude, the proposed Sahel tram-train project offers a sustainable and efficient solution to the transport challenges of Sousse. It is economically viable, with significant socio-economic benefits. Collaboration between public and private stakeholders is essential for successful implementation and improved transport in Sousse.<\/p>\n"}],"seo":{"title":"Extension of the Sahel Metro in tram-train mode in the conurbation of Sousse (Tunisia)"},"media":{"img":"<img width=\"2560\" height=\"1920\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-scaled.jpg\" class=\"attachment-full size-full\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-scaled.jpg 2560w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-300x225.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1024x768.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-768x576.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-1920x1440.jpg 1920w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/>","src":"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/04\/YBSTFU23_Metro_Sahel_couv-scaled.jpg"},"url":"\/en\/articles\/extension-of-the-sahel-metro-in-tram-train-mode-in-the-conurbation-of-sousse-tunisia\/","related":{"post":[],"author":[],"subject":[{"title":"Cities, Urban planning &#038; Construction","url":"\/en\/subjects\/cities-urban-planning-construction\/","id":"936","media":"<img width=\"1920\" height=\"1080\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville.jpg\" class=\"attachment- size- wp-post-image\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville.jpg 1920w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville-300x169.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville-1024x576.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-ville-768x432.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>","slug":"cities-urban-planning-construction"},{"title":"Mobility, Transport &#038; Infrastructure","url":"\/en\/subjects\/mobility-transport-infrastructure\/","id":"692","media":"<img width=\"1920\" height=\"1080\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites.jpg\" class=\"attachment- size- wp-post-image\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites.jpg 1920w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites-300x169.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites-1024x576.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2022\/11\/Ecole-des-ponts-webmagazine-mobilites-768x432.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>","slug":"mobility-transport-infrastructure"}],"category":[{"title":"On the School benches","url":"\/en\/articles\/category\/sur-les-bancs-de-lecole\/","id":"1721","media":"","slug":"sur-les-bancs-de-lecole","_related_post_type":""}],"folder":[{"title":"Mobility in Africa","url":"\/en\/folders\/mobility-in-africa\/","id":"6454","media":"<img width=\"2560\" height=\"1705\" src=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-scaled.jpg\" class=\"attachment- size- wp-post-image\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-scaled.jpg 2560w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-300x200.jpg 300w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-1024x682.jpg 1024w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-768x511.jpg 768w, https:\/\/ingenius.ecoledesponts.fr\/wp-content\/uploads\/2024\/06\/2017-Dakar-4-1920x1279.jpg 1920w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/>","slug":"mobility-in-africa"}]},"translated":"https:\/\/ingenius.ecoledesponts.fr\/articles\/prolongement-du-metro-du-sahel-en-mode-tram-train-dans-lagglomeration-de-sousse-tunisie\/","icon":"icon-article","duration":"9","custom_excerpt":"The project analyzes the Sousse transport system, identifies its limitations, and proposes a sustainable solution. Challenges include inadequate public transport and a heavy reliance on private cars. The chosen scenario extends the Sahel Metro with a tram-train system, covering 87km and improving accessibility. The route follows existing roads and creates intermodal hubs. The analysis estimates a daily flow of 50,971 passengers, confirming the project\u2019s viability. Tram-train operations present challenges but offer higher-quality service. The fleet size of 38 tram-trains is determined, and infrastructure enhancements are planned. The project\u2019s total cost is estimated at \u20ac707 million, with subsidies needed to balance the finances. The socio-economic assessment demonstrates positive impacts. The project will involve a balanced public-private structure, with the public-owned STTC managing construction and operation, and a private operator for the entire tram-train line.<br>","duration_type":"","_links":{"self":[{"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/posts\/5989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/comments?post=5989"}],"version-history":[{"count":5,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/posts\/5989\/revisions"}],"predecessor-version":[{"id":8996,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/posts\/5989\/revisions\/8996"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/media\/5569"}],"wp:attachment":[{"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/media?parent=5989"}],"wp:term":[{"taxonomy":"article-types","embeddable":true,"href":"https:\/\/ingenius.ecoledesponts.fr\/en\/wp-json\/wp\/v2\/article-types?post=5989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}